Planning and Scheduling Models for EMAS Productive Process

Article Preview

Abstract:

This paper addresses the problems of EMAS (an engineer material to arresting aircraft on the ground) production operation that the intensity of each product was uneven and cellular concrete was not completely crumple.In order to solve the problem the development of a nonlinear planning model for EMAS production was presented. The model is based on the company it could be helpful in guiding production. The second part of the work were optimization the model and get theoretical optimal value rely on both continuous and discrete time representations.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

553-556

Citation:

Online since:

August 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Cook, Robert F, Evaluation of a Foam Arrestor Bed for Aircraft Safety Overrun Areas , (UDR-TR-a88-07), University of Dayton Research Institute, Jan. (1988).

Google Scholar

[2] Angley R D, Ciesielski M S, Dial C T, et al. Vehicle arresting bed systems: U.S. Patent 6, 726, 400[P]. 2004-4-27.

Google Scholar

[3] ICAO. Status Engineered Material Arresting System Installations in the United States. A presentation by the North American, Central American and Caribbean Directors of Civil Aviation [G]. IGAO,2006. 06. 22.

Google Scholar

[4] EMAS Installation List (September 2012) http: /www. esco. zodiacaerospace. com/downloads/documents/ESCO-ZA_EMAS_Instal_List. pdf.

Google Scholar

[5] EMAS one of the series of reports - five of Civil Aviation of China Institute of Science and Technology, 2013. 1. http: /www. castc. org. cn/dtxw/zhxw/201211/t20121122_3638. html.

Google Scholar