2021
Ðнализ ÑаÑÑмаÑÑиваемой ÑиÑÑÐµÐ¼Ñ Ð²ÐºÐ»ÑÑал в ÑÐµÐ±Ñ ÑÑд задаÑ. РпеÑвом Ñазделе бÑл пÑоизведен вÑÐ±Ð¾Ñ Ð¸ пÑовеÑка оÑновного обоÑÑÐ´Ð¾Ð²Ð°Ð½Ð¸Ñ (ÑÑанÑÑоÑмаÑоÑов и линий ÑлекÑÑопеÑедаÑ).
openaire +1 more source
Ðнализ ÑаÑÑмаÑÑиваемой ÑиÑÑÐµÐ¼Ñ Ð²ÐºÐ»ÑÑал в ÑÐµÐ±Ñ ÑÑд задаÑ. РпеÑвом Ñазделе бÑл пÑоизведен вÑÐ±Ð¾Ñ Ð¸ пÑовеÑка оÑновного обоÑÑÐ´Ð¾Ð²Ð°Ð½Ð¸Ñ (ÑÑанÑÑоÑмаÑоÑов и линий ÑлекÑÑопеÑедаÑ).
openaire +1 more source
2019
The first chapter selects and tests the chosen equipment for the power system. In the second chapter, the steady state regime of the power system is calculated both manually and using the RastrWin software package. In the third chapter, the calculation of unbalanced short circuit currents at the selected point of the power system is carried out. In the
openaire +1 more source
The first chapter selects and tests the chosen equipment for the power system. In the second chapter, the steady state regime of the power system is calculated both manually and using the RastrWin software package. In the third chapter, the calculation of unbalanced short circuit currents at the selected point of the power system is carried out. In the
openaire +1 more source
2020
Тема вÑпÑÑкной квалиÑикаÑионной ÑабоÑÑ Â«Ð Ð°ÑÑÐµÑ ÑÑÑановивÑÐ¸Ñ ÑÑ Ð¸ пеÑÐµÑ Ð¾Ð´Ð½ÑÑ Ñежимов в ÑиÑÑеме ÑлекÑÑоÑÐ½Ð°Ð±Ð¶ÐµÐ½Ð¸Ñ 220/110 кл. ÐбÑекÑом иÑÑÐ»ÐµÐ´Ð¾Ð²Ð°Ð½Ð¸Ñ ÑвлÑеÑÑÑ Ð´Ð²ÑÑ Ð¼Ð°ÑÐ¸Ð½Ð½Ð°Ñ ÑиÑÑема ÑлекÑÑоÑнабжениÑ
openaire +1 more source
Тема вÑпÑÑкной квалиÑикаÑионной ÑабоÑÑ Â«Ð Ð°ÑÑÐµÑ ÑÑÑановивÑÐ¸Ñ ÑÑ Ð¸ пеÑÐµÑ Ð¾Ð´Ð½ÑÑ Ñежимов в ÑиÑÑеме ÑлекÑÑоÑÐ½Ð°Ð±Ð¶ÐµÐ½Ð¸Ñ 220/110 кл. ÐбÑекÑом иÑÑÐ»ÐµÐ´Ð¾Ð²Ð°Ð½Ð¸Ñ ÑвлÑеÑÑÑ Ð´Ð²ÑÑ Ð¼Ð°ÑÐ¸Ð½Ð½Ð°Ñ ÑиÑÑема ÑлекÑÑоÑнабжениÑ
openaire +1 more source
The aim of the study is to formulate the approach of the rebranding in the digital space. The study was carried out on the basis of publicly available information and personal informational resources of the educational organization «Aliance Plus».
openaire +1 more source
openaire +1 more source
2019
ÐÐ°Ð½Ð½Ð°Ñ ÑабоÑа поÑвÑÑена иÑÑÐ»ÐµÐ´Ð¾Ð²Ð°Ð½Ð¸Ñ Ñежимов и динамиÑеÑкой ÑÑÑойÑивоÑÑи ÑлекÑÑоÑнеÑгеÑиÑеÑкой ÑиÑÑÐµÐ¼Ñ 330/220 кÐ, в Ñ Ð¾Ð´Ðµ коÑоÑой бÑло вÑбÑано обоÑÑдование, в ÑооÑвеÑÑÑвии Ñ Ð¸ÑÑ Ð¾Ð´Ð½Ñми даннÑми, б
openaire +1 more source
ÐÐ°Ð½Ð½Ð°Ñ ÑабоÑа поÑвÑÑена иÑÑÐ»ÐµÐ´Ð¾Ð²Ð°Ð½Ð¸Ñ Ñежимов и динамиÑеÑкой ÑÑÑойÑивоÑÑи ÑлекÑÑоÑнеÑгеÑиÑеÑкой ÑиÑÑÐµÐ¼Ñ 330/220 кÐ, в Ñ Ð¾Ð´Ðµ коÑоÑой бÑло вÑбÑано обоÑÑдование, в ÑооÑвеÑÑÑвии Ñ Ð¸ÑÑ Ð¾Ð´Ð½Ñми даннÑми, б
openaire +1 more source
2020
In the course of work, the power supply system of 750/330 kV was studied. The work consists of four parts. In the first part of the work, a selection of the elements of the electric power system was made: transformers, autotransformers, and power transmission sections.
openaire +1 more source
In the course of work, the power supply system of 750/330 kV was studied. The work consists of four parts. In the first part of the work, a selection of the elements of the electric power system was made: transformers, autotransformers, and power transmission sections.
openaire +1 more source
2017
Рданной ÑабоÑе пÑоизведен ÑаÑÑÐµÑ ÑлекÑÑоÑнеÑгеÑиÑеÑкой ÑиÑÑÐµÐ¼Ñ 330/220 кÐ. ÐÑÑ Ð¾Ð´Ð½Ñе даннÑе Ð·Ð°Ð´Ð°Ð½Ð¸Ñ Ð²ÐºÐ»ÑÑали в ÑебÑ: ÑÑ ÐµÐ¼Ñ ÑÑаÑÑка ÑеÑи, Ñ Ð·Ð°Ð´Ð°Ð½Ð½Ñми нагÑÑзками и генеÑаÑией Ñзлов, клаÑÑов напÑÑÐ ...
openaire +1 more source
Рданной ÑабоÑе пÑоизведен ÑаÑÑÐµÑ ÑлекÑÑоÑнеÑгеÑиÑеÑкой ÑиÑÑÐµÐ¼Ñ 330/220 кÐ. ÐÑÑ Ð¾Ð´Ð½Ñе даннÑе Ð·Ð°Ð´Ð°Ð½Ð¸Ñ Ð²ÐºÐ»ÑÑали в ÑебÑ: ÑÑ ÐµÐ¼Ñ ÑÑаÑÑка ÑеÑи, Ñ Ð·Ð°Ð´Ð°Ð½Ð½Ñми нагÑÑзками и генеÑаÑией Ñзлов, клаÑÑов напÑÑÐ ...
openaire +1 more source
ÐбÑÐµÐºÑ Ð¸ÑÑÐ»ÐµÐ´Ð¾Ð²Ð°Ð½Ð¸Ñ â вÑÑокоÑемпеÑаÑÑÑÐ½Ð°Ñ ÑÐµÐ¿Ð»Ð¾Ð²Ð¸Ð·Ð¸Ð¾Ð½Ð½Ð°Ñ ÑиÑÑема. Ð¦ÐµÐ»Ñ ÑабоÑÑ â иÑÑледование оÑобенноÑÑей ÑабоÑÑ Ð¸ поÑенÑиалÑнÑÑ
Ñ
аÑакÑеÑиÑÑик измеÑиÑелÑной Ñепловизионной ÑиÑÑÐµÐ¼Ñ Ð´Ð»Ñ Ð½Ð ...
openaire +1 more source
openaire +1 more source
2019
The system of electricity supply 110/35 kV was studied. Power transformers and OHL were chosen. In addition this, steady state calculations were performed using both analytical methods and RastrWin software, on-peak and off-peak loading conditions were considered at calculation. The currents and voltages were determined for a one-phase short circuit at
openaire +2 more sources
The system of electricity supply 110/35 kV was studied. Power transformers and OHL were chosen. In addition this, steady state calculations were performed using both analytical methods and RastrWin software, on-peak and off-peak loading conditions were considered at calculation. The currents and voltages were determined for a one-phase short circuit at
openaire +2 more sources
2020
As part of the final qualification work, the power supply system of 330/110 kV was studied. The first section of the work included the preliminary selection and verification of the main equipment â generators, transformers, and power transmission line sections.
openaire +1 more source
As part of the final qualification work, the power supply system of 330/110 kV was studied. The first section of the work included the preliminary selection and verification of the main equipment â generators, transformers, and power transmission line sections.
openaire +1 more source