Results 1 to 10 of about 54,482 (260)
Some of the next articles are maybe not open access.
Aggregate planning for production
Business Horizons, 1967Abstract At its inception modern aggregate planning does pose difficulties, but these can be overcome—with results that greatly benefit the manager. For example, in developing this kind of planning one might have to consider whether inventory or size of the work force would absorb demand fluctuations.
openaire +1 more source
Introduction to Aggregate Planning and Strategies
2021In this chapter, we discuss what aggregate planning is and how managers exploit various strategies in aggregate planning. A demand prediction for the planning time frame (usually 2–18 months) is required to establish an aggregate plan. Then, this aggregate plan provides an intermediate-term plan that determines the production rate, subcontracting ...
Seyyed Amir Babak Rasmi, Metin Türkay
openaire +1 more source
A reformulation of the aggregate planning problem
Journal of Operations Management, 1986AbstractThis article proposes a reformulation of the aggregate planning problem which more closely agrees with situations frequently encountered in practice. The proposed reformulation assumes that a firm's production planners want to determine the expected service and inventory levels for a given production profile in the face of uncertain seasonal ...
Roger G. Schroeder, Paul D. Larson
openaire +1 more source
Plans, Planners, and Aggregates Mining
Journal of Planning Education and Research, 2000Planners often face disparate objectives in regulating the mining of aggregate minerals (sand, gravel, and crushed stone). In this article, the author uses the Baltimore-Washington region to examine how local jurisdictions manage aggregate minerals and the factors that help explain planners’ attitudes toward mineral protection.
openaire +1 more source
SSRN Electronic Journal, 2011
This report reviews the particulars provided in a case study that requires engineering analysis in reviewing the operations of a furniture manufacturer's processes in determining how best to meet the demand projections while holding the expenditures for this organization.
openaire +1 more source
This report reviews the particulars provided in a case study that requires engineering analysis in reviewing the operations of a furniture manufacturer's processes in determining how best to meet the demand projections while holding the expenditures for this organization.
openaire +1 more source
The Disaggregation of Aggregate Manpower Plans
Management Science, 1976Aggregate manpower plans can be made operational only if they are translatable into shorter range assignments of personnel to specific work groups, operations, and products or services. This paper describes a combined heuristic programming and simulation algorithm amenable to this process of decomposition.
Larry P. Ritzman +2 more
openaire +1 more source
Optimal Disaggregation of Aggregate Production Plans
Management Science, 1971Aggregate Production Planning (APP) is concerned with a minimum cost adaptation of some production process to demand fluctuations, by means of controlling overall production rate (P) and workforce size (W). Disaggregation aims at allocating P and W to individual products such that an optimal sales program is obtained.
openaire +2 more sources
Aggregation of Product Data for Hierarchical Production Planning
Operations Research, 1981When applying an aggregate view to production planning, the production system is given a hierarchical structure. The problem description at the upper level (which is less detailed) concerns product groups and machine groups rather than individual products and machines. This means that product structures and capacity requirements also must be expressed
openaire +2 more sources
Forward planning for aggregate production
2019This project was commissioned with the aim of modernising the production planning systems at CRMC through the introduction of a numerical based tool capable of planning production ahead of time. Project Aim This project consisted of three major goals: 1. Develop an understanding of quarry production systems 2.
openaire +2 more sources

