Results 171 to 180 of about 3,194 (191)
Some of the next articles are maybe not open access.
Polyramix™: A Depositable Replacement for Asbestos Diaphragms
1990OxyTech Systems is a joint venture company formed between Occidental Chemical Company (formerly Hooker Chemical and Diamond Shamrock Chemical Companies) and ELTECH Systems to license, market and continue to improve upon the technology and rich heritage of the parent companies in the field of chlor-alkali electrolysis.
L. C. Curlin +2 more
openaire +1 more source
Space Shuttle solid propellant rocket motors, asbestos filled insulation replacement
33rd Joint Propulsion Conference and Exhibit, 1997This paper discusses the process used to develop a replacement for asbestos containing rubber insulation in the space shuttle reusable solid rocket motor (RSRM). The developed asbestos free RSRM (AFRSRM) design uses four rubbers to satisfy competing structural and thermal-ablative requirements.
Vernon Fitch +3 more
openaire +1 more source
Growth-Packed PPT-A Fiber for the Replacement of Native Asbestos
MRS Proceedings, 1989AbstractA now type of crystal that can be defined as a “gel crystal” was first made with oligomeric poly-p-phenyleneterephthalainide (PPT-A), associating a large amount of dimethylacetamide (DMAc) liquid molecules, in which catalytic amount of heterocyclic tertiary amine, coupled with alkali metal cations or phosphoric triamidos are incorporated. Under
openaire +1 more source
2021
This paper presents the results of contractor worker personal exposure monitoring from 3,663 samples and construction management (CM) worker monitoring from 1,292 samples collected during the 7-year Calaveras Dam Replacement Project. The samples were analyzed using NIOSH M7400 and adjusted using NIOSH M7402.
Dan Hernandez, Bradley G. Erskine
exaly +2 more sources
This paper presents the results of contractor worker personal exposure monitoring from 3,663 samples and construction management (CM) worker monitoring from 1,292 samples collected during the 7-year Calaveras Dam Replacement Project. The samples were analyzed using NIOSH M7400 and adjusted using NIOSH M7402.
Dan Hernandez, Bradley G. Erskine
exaly +2 more sources
Regulatory Toxicology and Pharmacology, 2015
A simulation study was conducted to evaluate worker and area exposure to airborne asbestos associated with the replacement of asbestos-containing gaskets and packing materials from flanges and valves and assess the influence of several variables previously not investigated.
Amy K Madl, Angela L Perez, Paul K Scott
exaly +3 more sources
A simulation study was conducted to evaluate worker and area exposure to airborne asbestos associated with the replacement of asbestos-containing gaskets and packing materials from flanges and valves and assess the influence of several variables previously not investigated.
Amy K Madl, Angela L Perez, Paul K Scott
exaly +3 more sources
Industrial Lubrication and Tribology, 2019
Purpose The purpose of this study is to investigate the influence of commercially available iron–aluminum alloy compared to copper, iron and aluminum powders on the tribological performances of friction composites. The main objective is to replace copper from the friction composite formulations.
Saikrishnan G. +3 more
openaire +1 more source
Purpose The purpose of this study is to investigate the influence of commercially available iron–aluminum alloy compared to copper, iron and aluminum powders on the tribological performances of friction composites. The main objective is to replace copper from the friction composite formulations.
Saikrishnan G. +3 more
openaire +1 more source
Improving the efficiency of water supply by replacing asbestos-cement pipes in Montenegro
46. Medunarodna konferencija Vodovod i kanalizacija 25 - Zbornik radova - zbornik radovaThe paper presents the results of a comprehensive project for the modernization and improvement of water supply systems in Montenegro through the replacement of asbestos-cement (AC) pipes. The analysis covered 23 cities, assessing network conditions, identifying technical and management challenges, and elaborating investment priorities up to 2055.
openaire +1 more source
261. An Evaluation of The Removal and Replacement of Asbestos-Containing Valve Packing
AIHce 2002, 2002M. Plisko, J. Spencer
openaire +1 more source

