Results 131 to 140 of about 5,887,029 (167)
Some of the next articles are maybe not open access.

Design and Construction of the Energy Berthing Dock and Access Pier at the Esso Bahamas Clifton Terminal Facility

Ports 2007, 2007
The Esso Bahamas Clifton Terminal supplies a large majority of all fuel to New Providence Island (Nassau) and the outlying islands. Part of the terminal facilities includes a fuel distribution dock that provides berthing/mooring for small tankers that supply fuel throughout the Bahamas’ islands in the Caribbean.
Patrick R. Graney, Arturo Hernandez
openaire   +1 more source

Optimisation of berth and quay crane joint scheduling considering efficiency and energy consumption

International Journal of Shipping and Transport Logistics, 2023
Mingjun Ji   +4 more
openaire   +1 more source

Coordinated Assignment of Heterogeneous Energy Services for Berthed Vessels under Simultaneous Operations

Port electrification creates a heterogeneous energy-service environment in which shore power,battery swapping, and auxiliary-engine (AE) fallback coexist. Existing scheduling models treatenergy replenishment as sequential to cargo handling; the resulting additive completion-timeassumptions overestimate vessel dwell time and distort the comparative ...
Xu Zhao   +3 more
openaire   +1 more source

Artificial Intelligence (AI)- based Energy Efficiency Management for Ships at Berths

The rapid transformation of global energy systems toward low-carbon and decentralized architectures has introduced unprecedented complexity in planning, operation, and control. Large-scale integration of renewable energy sources, electric vehicles, distributed storage, and prosumer-driven markets requires intelligent, adaptive, and data-driven ...
openaire   +1 more source

Berth allocation and quay crane assignment in a container terminal for the trade-off between time-saving and energy-saving

Advanced Engineering Informatics, 2016
This paper addresses the problem of integrated berth allocation and quay crane (QC) assignment for the trade-off between time-saving and energy-saving. This problem is formulated as a mixed integer programming model (MIP), in order to minimize the total departure delay of all vessels and the total handling energy consumption of all vessels by QCs ...
openaire   +2 more sources

Energy Demand Estimation for Shoreside Power Supply to Vessels Queued for Berthing at Brazilian Ports

This study estimates the electrical demand required to provide shore-side power to vessels queued at berth for the Port of Rio de Janeiro, combining AIS data with ship characteristics databases to support infrastructure planning and sustainable port operations.
Lordelo, Vinicius de Castro   +3 more
openaire   +1 more source

Optimal scheduling for seaport integrated energy system considering flexible berth allocation

Applied Energy, 2022
Anjia Mao   +5 more
openaire   +1 more source

Ship’s Berthing Energy by Determining Effective Coefficients for Optimum Performance of Marine Fender

Journal of the Korean Society for Advanced Composite Structures, 2023
YongHee Kim   +4 more
openaire   +1 more source

Path Following Algorithm Application to Automatic Berthing Control

Journal of Marine Science and Technology, 2021
Ryohei Sawada   +2 more
exaly  

Home - About - Disclaimer - Privacy