Results 231 to 236 of about 1,932 (236)
Some of the next articles are maybe not open access.

Optimal Design of Boil-Off Gas Liquefaction in LNG Regasification Terminals

2018
Harsha Nagesh Rao   +2 more
openaire   +1 more source

Characteristics of boil-off-gas partial re-liquefaction systems in LNG ships

Journal of the Korean Society of Marine Engineering, 2016
openaire   +1 more source

High-efficient boil-off gas storage using low-temperature activated carbon adsorption

Gas Science and Engineering
J.K. Wu, Y.X. Zhang, M. Yu, L. Jiang
openaire   +1 more source

A new recovery process of BOG (boil-off-gas) using low-temperature nitrogen

2013 International Conference on Materials for Renewable Energy and Environment, 2013
Min Chen   +3 more
openaire   +1 more source

Dynamic Simulation of a LNG Regasification Terminal and Management of Boil-off Gas

2018
Vikas Singh Bisen   +2 more
openaire   +1 more source

Home - About - Disclaimer - Privacy