Results 211 to 220 of about 110,361 (245)
Some of the next articles are maybe not open access.

Berth allocation and quay crane assignment/scheduling problem under uncertainty: A survey

European Journal of Operational Research, 2022
Filipe Rodrigues, Agostinho Agra
exaly  

Optimal Way of Bridge Crane Track Welding

2013
Gantry and bridge cranes that provide loading for heavy items and materials require stable and continuous support. This safe support is achieved by using crane track rails, with a maximum of 120 cm2 cross-sectional area. When welding rails, the welding operators mostly apply the commonly used techniques, and choose manual metal arc welding or flux ...
openaire   +1 more source

Yard crane and AGV scheduling in automated container terminal: A multi-robot task allocation framework

Transportation Research Part C: Emerging Technologies, 2020
Shiwei He, Yongxiang Zhang, Lu Tong
exaly  

BIM-based 4D mobile crane simulation and onsite operation management

Automation in Construction, 2021
Ala Nekouvaght Tak, Hosein Taghaddos
exaly  

Home - About - Disclaimer - Privacy