Results 51 to 60 of about 110,361 (245)

Titin Is Present in the Elastic Tethers That Connect Separating Anaphase Chromosomes in Crane‐Fly Spermatocytes

open access: yesCytoskeleton, EarlyView.
ABSTRACT Elastic tethers connect telomeres of separating chromosomes in anaphase of animal cells. Immunofluorescence staining of titin in crane‐fly spermatocytes, using 4 different antibodies, shows that the giant elastic protein titin seems to be a component of mitotic tethers: titin “strands” extend between separating chromosomes, connecting their ...
Demetra Economopoulos   +5 more
wiley   +1 more source

Structural Health Monitoring for Bridge Crane Based on Low Temperature-Sensitivity FBG Sensors

open access: yesFrontiers in Physics, 2021
Accurate measurement of the stain variation and effective distinguishment of the temperature-induced stress from the load-induced stress have been major objectives for strain sensors in crane monitoring.
Zhang Zhaobo   +3 more
doaj   +1 more source

Optimization of mechanical characteristics of drive of bridge crane in mode of two-stage pluggin braking [PDF]

open access: yes, 2015
Выполнен поиск оптимальных механических характеристик привода передвижения мостового крана грузоподъемностью 10 т и пролетом 22,5 м в режиме двухступенчатого противовключения.
Nezhentsev, А.B.   +5 more
core  

Managers' Sustainability Mindset: The Role of Place Attachment and Absorptive Capacity

open access: yesCorporate Social Responsibility and Environmental Management, EarlyView.
ABSTRACT Sustainability mindset among managers is crucial for advancing sustainable development and creating long‐term environmental and social value. This study focuses on middle managers in Indian organizations and explores how place attachment and managerial absorptive capacity affect their sustainability mindset.
Asha K. S. Nair   +2 more
wiley   +1 more source

Modeling the Dynamic Loads Affecting a Bridge Crane during Start-Up

open access: yesAdvanced Engineering Research
Introduction. The dynamic loads during the start-up of a bridge crane can cause excessive stress in the structure and components, leading to potential safety hazards and increased wear and tear.
I. R. Antipas
doaj   +1 more source

Dynamic weighted idle time heuristic for flowshop scheduling [PDF]

open access: yes, 2015
The constructive heuristic of Nawaz, Enscore and Ham (NEH) has been introduced in 1983 to solve flowshop scheduling. Many researchers have continued to improve the NEH by adding new steps and procedures to the existing algorithm.
Ahmad, Abd Rahman   +3 more
core   +1 more source

Human Capital Robotic Integration and Value Creation for Organizations

open access: yesJournal of Organizational Behavior, EarlyView.
ABSTRACT Due to rapid advancements in artificial intelligence and machine learning, the research conversation has drifted from viewing robots as replacements for humans (i.e., the substitute view) to a view that considers the possible benefits of human–robot collaboration in the workplace (i.e., the complementary view).
Chou‐Yu Tsai   +6 more
wiley   +1 more source

Motion of cranes of bridge type simulation in the MS Excel environment [PDF]

open access: yes, 2014
The idle times of the crane caused by need of replacement of wheels, can have critical value for functioning of a logistic chain. In article the task about the movement of the crane with a skew with the accounting of several mutually influencing ...
Grigorov, Otto, Stepochkina, Olga
core  

Designer DNA‐Based Machines

open access: yesSmartBot, EarlyView.
DNA machinery represents a burgeoning frontier at the intersection of robotics and nanotechnology, evolving from static nanostructure toward dynamic nanorobots. Here, the authors review the comprehensive research pipeline of designer DNA‐based nanomachines, covering the design, analysis, and fabrication. These programmable systems enable transformative
Yiquan An   +5 more
wiley   +1 more source

STUDY OF LIGHTWEIGHT DESIGN ON GIRDER OF BRIDGE CRANE

open access: yesJixie qiangdu, 2015
Lightweight design on bridge crane exist the following problems by ANSYS: Mostly using static indicators as a design criterion,ignoring the dynamic performance; the whole process takes a long time; and the parameters optimized often should be rounded ...
TANG Hui   +3 more
doaj  

Home - About - Disclaimer - Privacy