Results 261 to 270 of about 603,535 (296)
Some of the next articles are maybe not open access.

Blowout Risk Analysis of Gas-Lift Completions

SPE Production Engineering, 1992
Summary A dynamic risk analysis was performed on four different gas-lift completions using a computer simulator. Results are presented to allow comparison of the designs in terms of blowout risk and minor leakage during production and to provide insight into the effect of critical components and operations on the overall well safety.
D. D. Grassick   +3 more
openaire   +1 more source

A Spoolable Coiled-Tubing Gas-Lift Completion System

Proceedings of SPE Annual Technical Conference and Exhibition, 1993
ABSTRACT BP Exploration and Nowcam Services have re-completed a well in the Western Operating Area (WOA) of the Prudhoe Bay Unit with a spoolable coiled tubing gas lifted completion. This completion is unique in that gas lift valves are inside the coiled tubing.
E. J. Walker   +4 more
openaire   +1 more source

Soundness and completeness versus lifting property

1996
We give new formulations of the property of soundness and completeness of a resolution system and of the lifting lemma, and we discuss their relationship.
openaire   +1 more source

A complete model for oxidation air-lift reactors

Computers & Chemical Engineering, 2001
Abstract A complete model for prediction performance of an oxidation air-lift reactor has been developed. The model includes reaction kinetics, flow configuration, mass transfer and hydrodynamics. Liquid bulk and gas phases are modeled using a cell model. The mass transfer rates are computed from the film model.
E. Camarasa   +8 more
openaire   +1 more source

Dual Gas Lift in Wells With Downhole Water Sink Completion

Canadian International Petroleum Conference, 2002
Abstract Downhole Water Sink (DWS) technology controls water coning in dual-completed wells by concurrently producing water from the bottom completion - below the oil-water contact, and oil from another completion at the top of the oil sand.
L. Marcano, A.K. Wojtanowicz
openaire   +1 more source

Completion of the Claymore Gas-Lift Optimisation Project

Proceedings of European Petroleum Conference, 1984
Abstract This is a case history of an innovative process, thatof a gas lift optimisation supervisory system, currently in operation on Occidental's Claymore Platform. It describes the initial arrangement on Claymore, showing why and how the system came into being, what it consists of by way of hardware, and how the ...
openaire   +1 more source

Complete lifts of derivations to tensor bundles

2002
The authors study the complete lifts of derivations on an \(n\)-dimensional differentiable manifold \(M\) of class \(C^\infty\), and consider some geometric applications of the tangent bundle. Contents include: an introduction; vertical lifts of tensor fields and the \(\gamma\)-operator; complete lifts of derivations and \(\gamma\)-operator; complete ...
SALIMOV, Arif, CENGİZ, Nejmi
openaire   +2 more sources

Complete lifts of projectable linear connection to semi-tangent bundle

2019
Summary: We study the complete lifts of projectable linear connection for semi-tangent bundle. The aim of this study is to establish relations between these and complete lift already known. In addition, the relations between infinitesimal linear transformations and projectable linear connections are studied.
YILDIRIM, FURKAN, POLAT, MURAT
openaire   +3 more sources

Complete Lifts of Σ‐Spaces

Mathematische Nachrichten, 1989
A. J. Ledger, M. Toomanian
openaire   +1 more source

Deployment of a Coiled-Tubing Gas-Lift Completion

Journal of Petroleum Technology, 1997
This article is a synopsis of paper SPE 38536, "Deployment of a Coiled-Tubing Gas-Lift Completion and Subsequent Recovery of Reserves From a Marginal BP Forties Well," by M.I. Smith, Schlumberger IPM, and R. Brown, Camco (U.K.) Intl. Ltd., originally presented at the 1997 Offshore Europe Conference held in Aberdeen, 9-12 September.
openaire   +1 more source

Home - About - Disclaimer - Privacy