Improvement of control of construction and installation works
Introduction. Effective activity in the construction of business entities enhances competitiveness and enhances their ability to reproduce production and economic activity on an innovative basis. At the same time, mistakes and abuse during the recording of construction operations cause not only a distorted idea of the scale and results of construction ...
Volodymyr Osmyatchenko, Kateryna Pinchuk
openaire +2 more sources
Visualization of process maps for construction and installation works
Abstract the article presents the principles, methods and means of visualization of organizational and technological solutions developed as a part of technological maps for the production of construction and special operations. In this paper, the authors analyze the possible ways of the development of visualization of organizational and ...
S A Sinenko, S A Aliev
openaire +1 more source
LEGAL AND ACCOUNTING ASPECTS OF CONSTRUCTION CONTRACTS [PDF]
This article examines the legal and accounting aspects specific to construction contracts based on the provisions of the legislation of the Republic of Moldova, which mainly refer to: the classification and composition of construction contracts, the ...
Angela POPOVICI
doaj +1 more source
Analysis And Optimization Of The Cost Of Construction And Installation Work At Construction Sites
In this research paper provides analysis of compliance with the construction deadlines showed a violation of the construction duration for many objects. All this speaks of the unfavorable financial condition of the enterprise. During the analysis, it was found that the increase in cost was associated with an increase in the cost of all production ...
openaire +1 more source
The formation of engine parks of the construction organizations with accounting of energy efficiency and environmental friendliness [PDF]
Increase in energy efficiency of construction allows reducing costs of technical operation of parks of the equipment and increasing construction energy saving level in general.
Prochorov Sergey
doaj +1 more source
Method of Planning Repairs of the Installation including Building Waste
Repairs of water supply, sewage and central heating installations in residential buildings should be carried out systematically. However, very often, renovation dates are postponed, which results in installation failures.
Beata Nowogońska, Ireneusz Nowogoński
doaj +1 more source
Influence of natural and climatic factors on the organization of construction [PDF]
In this research the influence of natural and climatic conditions on the organization of construction production are examined. Our purpose was to identify the nature of the dependence of the duration of construction work on natural and climatic factors ...
Kuzhin Marat +2 more
doaj +1 more source
Green building investment control system based on a three-dimensional parametric model of the green building [PDF]
Investment in construction projects is a rather complex process. The customer of construction product, as a rule, is also its investor and for him the systematization of information about the construction process is a necessity.
Monastyreva Daria, Astafieva Natalia
doaj +1 more source
Optimization of activities of road construction company based on lean manufacturing tools [PDF]
The article proposes an algorithm for implementation of lean manufacturing in relation to a company in the road construction industry. The concept of lean manufacturing involves the possibility of using several tools at the same time to solve the ...
Minnullina Anna, Solopova Natalya
doaj +1 more source
Features of the application of the dumpster-shafer theory when adopting management decisions in construction operations [PDF]
The article discusses the features of the application of the Dempster-Shafer theory in the management and planning of construction operations. An example of expert evaluation is given, the most possible reasons for the delay of construction and ...
Pogodin Denis +2 more
doaj +1 more source

