Results 1 to 10 of about 1,503,108 (152)

Feasibility of continuous action unit parameters for road underlay formation

open access: yesВестник СибАДИ, 2021
Introduction. Russia has a large spatial disunity of settlements and other objects. Therefore, it is irrational to use low-productivity technical means of cyclical action in the construction of roads.
V. A. Nikolaev
doaj   +3 more sources

Lower drive of continuous action unit to form underlying layer of road

open access: yesВестник СибАДИ, 2021
Introduction. A continuous action unit for the formation of an underlying layer is designed to increase productivity in the construction of roads and other facilities, for which it is necessary to remove the top layer of soil.
V. A. Nikolaiev
doaj   +3 more sources

Interaction analysis of bucket bottom knife with soil to build up subbase

open access: yesВестник СибАДИ, 2020
Introduction. To solve the problem of accelerating the construction of roads, improving their quality, it is advisable to use a continuous action unit to form a underlying layer.
V. A. Nikolaev
doaj   +4 more sources

Domain-Incremental Continual Learning for Mitigating Bias in Facial Expression and Action Unit Recognition

open access: yesIEEE Transactions on Affective Computing, 2023
As Facial Expression Recognition (FER) systems become integrated into our daily lives, these systems need to prioritise making fair decisions instead of aiming at higher individual accuracy scores. Ranging from surveillance systems to diagnosing mental and emotional health conditions of individuals, these systems need to balance the accuracy vs ...
Churamani, Nikhil   +2 more
openaire   +2 more sources

Vivências durante a Pandemia de ações de educação permanente em saúde em uma unidade de Pronto Atendimento (UPA) / Experiences during the Pandemic of continuing education actions in health in an Emergency Care Unit (UPA) [PDF]

open access: yesBrazilian Journal of Development, 2022
Objetivou-se relatar as ações de Educação Permanente em Saúde com profissionais de saúde acerca da COVID-19 em uma Unidade de Pronto Atendimento no interior de Mato Grosso. Trata-se de relato de experiência das ações de um projeto de extensão realizadas entre junho a novembro do ano de 2020.
Lavínia Alves Da Silva   +3 more
openaire   +1 more source

Continuous action right knife unit with ground interaction analysis

open access: yesВестник СибАДИ, 2020
Introduction. To solve the problem of accelerating the construction of roads, improving their quality, it is advisable to use a continuous action unit to form a underlying layer.
V. A. Nikolayev, D. I. Troshin
doaj   +1 more source

Launching continuous kangaroo mother care through participatory action research in Iran

open access: yesBMC Health Services Research, 2023
Background This study describes the launching of a unit for continuous kangaroo mother care (KMC) in a teaching hospital (Taleghani) in Iran. Methods We used a participatory three-stage action research approach to establish a unit for continuous KMC ...
Marzieh Mohammadi   +5 more
doaj   +1 more source

Geometric, kinematic and dynamic parameters of the disc ripper

open access: yesВестник СибАДИ, 2021
Introduction. The unit of continuous action for the formation of the underlying layer is designed to increase labour productivity in the construction of roads and other objects, for the construction of which it is necessary to remove the upper layer of ...
V. A. Nikolayev
doaj   +1 more source

Random Forest Regression for continuous affect using Facial Action Units

open access: yes, 2022
In this paper we describe our approach to the arousal and valence track of the 3rd Workshop and Competition on Affective Behavior Analysis in-the-wild (ABAW). We extracted facial features using OpenFace and used them to train a multiple output random forest regressor. Our approach performed comparable to the baseline approach.
Hinduja, Saurabh   +4 more
openaire   +2 more sources

Energy expenditure on ground cutting by continuous action buckets to form the underlying layer of the road

open access: yesВестник СибАДИ, 2020
Introduction. To solve the problem of accelerating the construction of roads, improving their quality, it is advisable to use a continuous action unit to form a underlying layer.
V. A. Nikolaev
doaj   +1 more source

Home - About - Disclaimer - Privacy