Results 91 to 100 of about 1,867,983 (246)
Penerapan Manajemen Waktu Menggunakan Network Planning (Cpm) pada Proyek Konstruksi Jalan (Studi Kasus Peningkatan Jalan SP. Berembang – SP. Jambi Kecil) [PDF]
One of the methods in the application of Network Planning on construction projects is the Critical Path Method (CPM).Use of critical path method is to be able to know the the critical path of a project in which an activity can not be delayed, so that the
Handayani, E. (Elvira) +1 more
core
Aplikasi Metoda Line of Balance (Lob) Dan Metoda Critical Path Method (Cpm) Dalam Penjadwalan Kegiatan Pembangunan Perumahan [PDF]
Sutanto, in this paper explain that line of Balance is a variation of the linear scheduling method that allows the operating balance so that all activities can continue.
Sutanto, S. (Sutanto)
core
Improving Time-Cost Balance in Critical Path Method (CPM) Using Dragonfly Algorithm (DA) [PDF]
The CPM (critical path method) technique is to search out the longest path to try and do activities, so as to compress and cut back the time it takes for a project, which finally ends up inside the creation of an identical and intensive network of ...
Mohmmad Anvar Adibhesami +3 more
doaj
IMPROVEMENT OF DEGREE OF CONFIDENCE IN CRITICAL PATH METHOD USING Z NUMBER
Sukanta Kundu +2 more
openalex +2 more sources
Slope reliability assessment using an innovative critical failure path approach
Slope instability, driven by factors such as rainfall, seismic activity, and human influence, presents a pervasive hazard worldwide. Timely assessment of slope stability and accurate identification of its most critical slip surface are important for ...
Xiyang Tang +4 more
doaj +1 more source
Agile Improvements to Critical Path Method
Agile project managers have a difficult time communicating schedules in traditional formats. For example, integrated master schedules, work breakdown structures, and so on are expected by project leadership, especially if they are new to agile. Agile does not include detailed level planning, years in advance. Instead, it focuses on small increments and
openaire +1 more source

