The Critical Path Method

2012
This chapter makes an effort to tighten the gap between the project scheduling literature and the needs of project managers and schedulers through the use of a practical computerized simulation game. Project managers are constantly confronted with the intricacy of scheduling a complex real-life problem in an efficient way when they often have little ...
openaire   +1 more source

Calculating Critical Path: Comparison of heuristic methods

2016 XIX IEEE International Conference on Soft Computing and Measurements (SCM), 2016
Network analysis provides an effective practical system for planning and controlling large projects in construction and many other fields. The purpose of the Critical Path Method (CPM) is to identify critical activities on the critical path so that resources may be concentrated on these activities in order to reduce project length time.
A. A. Goryachev   +3 more
openaire   +1 more source

Non-linear optimization of critical path method

2017 3rd International Conference on Science in Information Technology (ICSITech), 2017
Time and Cost Optimization (TCO) may be described as a process to identify appropriate construction activities to get the minimum duration of process and minimum additional cost which are needed. Critical Path Method (CPM) crashing project is one of methods to solve the time and cost optimization.
Yutika Amelia Effendi, Riyanarto Sarno
openaire   +1 more source

critical path method (CPM)

2009
Project management technique which calculates total duration of a project based on individual task durations and dependencies, and identifies which tasks are time-critical.
openaire   +1 more source

CRITICAL PATH METHOD OF WORK SCHEDULING

Journal AWWA, 1969
Efficient work scheduling is a management function too often beset by guesswork. The critical path method of scheduling creates a picture of the time‐work rerationship and allows a constructor to forecast his workload on a project for time and money savings.
openaire   +1 more source

Fuzzy durations in critical path method

[Proceedings 1993] Second IEEE International Conference on Fuzzy Systems, 2002
The previous application of fuzzy members to the critical path method, as is known from literature, provides only the earliest expected time for each event of the project. The author shows that a further extension can be made by considering interactive fuzzy subtraction and by observing that only the positive part of the fuzzy numbers can have a ...
openaire   +1 more source

Project Mangement by the Critical Path Method

Research Management, 1970
(1970). Project Mangement by the Critical Path Method. Research Management: Vol. 13, No. 4, pp. 291-300.
R. M. Walsh   +3 more
openaire   +1 more source

Critical Path Methods

Journal of the Operational Research Society, 1967
A. Battersby, J. A. Carruthers
openaire   +2 more sources

A Survey of Critical Path Methods Literature

2001
Critical path network analysis techniques are regarded as one of the ‘classic’ mathematical operational research topics, along with such other topics as linear programming, inventory modelling, and computer simulation. For this reason, introductory treatments are to be found, as a rule, in most general OR texts. However, they are not, and should not be
Mik Wisniewski, Jonathan H. Klein
openaire   +1 more source

Exploring Critical Path Solving Methods under Neutrosophic

International Journal of Neutrosophic Science
Over the past few decades, the traditional critical path method and its various generalizations have become the most popular technique for managing complex projects. It plays a crucial role in differentiating between critical and non-critical tasks to enhance project schedules.
Ranjan Ranjan, Ranjan Kumar
openaire   +1 more source