Results 21 to 30 of about 41,505 (256)

IMPORTANCE OF EARNED VALUE METHOD (EVA) IN THE PERFORMANCE ANALYSIS OF PROJECTS [PDF]

open access: yesAnalele Universităţii Constantin Brâncuşi din Târgu Jiu : Seria Economie, 2016
The economics of the projects is an important process in the project management. Effective control of projects is based on appropriate methods for monitoring, and the entire project, the timetable, cost, quality and risk.
MARGARITA JANESKA   +2 more
doaj  

Health insurance sector in India: an analysis of its performance [PDF]

open access: yesVilakshan (XIMB Journal of Management), 2020
Purpose – Health insurance is one of the major contributors of growth of general insurance industry in India. It alone accounts for around 29% of total general insurance premium income earned in India.
Madan Mohan Dutta
doaj   +1 more source

Analysis of the Earned Value Management and Earned Schedule Techniques in Complex Hydroelectric Power Production Projects: Cost and Time Forecast

open access: yesComplexity, 2019
All projects take place within a context of uncertainty. That is especially noticeable in complex hydroelectric power generation projects, which are affected by factors such as the large number of multidisciplinary tasks to be performed in parallel, long
P. Urgilés, J. Claver, M. A. Sebastián
doaj   +1 more source

Analisis Monitoring Pelaksanaan Pekerjaan Proyek Pasar Rakyat Bareng Kota Malang

open access: yesRekayasa Sipil, 2017
Curve-S, Earned Value, and Tracking. The results of the analysis using the curve method S, week 1 to 6 project acceleration took place, while at week 17, 18, and 19 projects too late.
Faris Rizal Andardi   +2 more
doaj   +1 more source

Penerapan Metode Earned Value Analysis Terhadap Waktu Penjadwalan

open access: yesJurnal Konstruksi, 2023
Manajemen proyek adalah suatu aktivitas yang didalamnya terdiri atas kegiatan merencanakan, memimpin, mengorganisir, serta mengendalikan sumberdaya organisasi perusahaan untuk mencapai tujuan organisasi yang telah ditentukan dalam jangka waktu tertentu dengan sumber daya tertentu.
openaire   +1 more source

Forecasting techniques in construction industry: earned value indicators and performance models

open access: yesPrzegląd Naukowy Inżynieria i Kształtowanie Środowiska, 2020
Machine Learning Regression Techniques (MLRT) as a shrewd method can be utilized in this study being exceptionally fruitful in demonstrating non-linear and the interrelationships among them in problems of construction projects such as the earned value ...
Firas K. Jaber   +2 more
doaj   +1 more source

Mitigating Time and Cost Overruns in Construction Projects: A Questionnaire Study on Integrating Earned Value Management and Risk Management

open access: yesJournal of Studies in Science and Engineering, 2023
One of the persistent challenges in the construction industry is accurately estimating time and costs for civil engineering projects. Inadequate planning in these areas can lead to unexpected expenses and delays.
Ahmed Rasul Hussein, Sina Fard Moradinia
doaj   +1 more source

Discovery and Targeted Proteomic Studies Reveal Striatal Markers Validated for Huntington's Disease

open access: yesAnnals of Clinical and Translational Neurology, EarlyView.
ABSTRACT Objective Clinical trials for Huntington's disease (HD) enrolling persons before clinical motor diagnosis (CMD) lack validated biomarkers. This study aimed to conduct an unbiased discovery analysis and a targeted examination of proteomic biomarkers scrutinized by clinical validation. Methods Cerebrospinal fluid was obtained from PREDICT‐HD and
Daniel Chelsky   +8 more
wiley   +1 more source

ANALISIS KINERJA PROYEK PEMBANGUNAN RUMAH SAKIT BANYUMANIK II DENGAN MENGGUNAKAN EARNED VALUE ANALYSIS (EVA) DAN PROJECT EVALUATION REVIEW TECHNIQUE (PERT)

open access: yesJ@ti Undip: Jurnal Teknik Industri, 2016
Penelitian ini bertujuan untuk untuk mengevaluasi kinerja proyek pembangunan Rumah Sakit Banyumanik II serta memberikan rekomendasi penjadwalan ulang atas pelaksanaan proyek teresebut.
Aries Susanty   +2 more
doaj   +1 more source

Earned Value Analysis on National Salt Warehouse Construction Project

open access: yesIOP Conference Series: Materials Science and Engineering, 2020
Abstract Earned Value Analysis is one of the tools used in managing projects that integrate time and cost. The purpose of this study is to calculate Earned Value Analysis using a visual basic program on the time and cost of implementing the National Salt Warehouse construction project, and to get the cause of the delay in the ...
Pramudita Budi Santoso, Hendrik Sulistio
openaire   +1 more source