Results 11 to 20 of about 558,468 (307)

A modified earned value management using activity based costing [PDF]

open access: yesJournal of Project Management, 2016
Earned Value Management (EVM) has been a well-known methodology used since the 1960s when the US department of defense proposed a standard method to measure project perfor-mance. This system relies on a set of often straightforward metrics to measure and
Vahid Aminian   +3 more
doaj   +1 more source

MONITORING AND CONTROL SYSTEM OF THE STAKEHOLDERS ACTIVITIES FOR PROJECT BASED ON THE EARNED DURATION MANAGEMENT METHOD

open access: yesМодернизация, инновация, развитие, 2018
Purpose: the purpose of the article is to describe the Earned Duration Management method in relation to individual phases of the project and the project as a whole.
R. Yu. Dashkov, A. V. Tislenko
doaj   +1 more source

Management model of investment projects using the earned value method [PDF]

open access: yesMining and Metallurgy Engineering Bor, 2013
The Earned Value Method represents a relatively new project management tool, which uses the information on costs, time schedule and operating performance in order to determine the current status of the project.
Stojanović Cvjetko, Ostojić Ivana
doaj   +1 more source

CONSTRUCTION PROJECT CONTROL ANALYSIS USING EARNED VALUE MANAGEMENT, EARNED SCHEDULE MANAGEMENT, EARNED DURATION MANAGEMENT

open access: yesJurnal Infrastruktur, 2023
Appropriate control methods are needed to anticipate potential problems and make construction projects better managed to improve efficiency, productivity, and quality of work. Earned Value Management (EVM) experienced problems in predicting duration because it used two scopes, namely cost and schedule.
Azaria Andreas   +2 more
openaire   +1 more source

Mitigating Time and Cost Overruns in Construction Projects: A Questionnaire Study on Integrating Earned Value Management and Risk Management

open access: yesJournal of Studies in Science and Engineering, 2023
One of the persistent challenges in the construction industry is accurately estimating time and costs for civil engineering projects. Inadequate planning in these areas can lead to unexpected expenses and delays.
Ahmed Rasul Hussein, Sina Fard Moradinia
doaj   +1 more source

EARNED VALUE ANALYSIS, IMPLEMENTATION BARRIERS, AND MATURITY LEVEL IN OIL & GAS PRODUCTION

open access: yesSouth African Journal of Industrial Engineering, 2019
Poor performance measurement practices in the oil and gas industry can cause project cost overruns, schedule delays, and scope increases. Earned value management, as an integrated project planning and control method measuring cost and schedule ...
Zhan, Zhaoxi   +4 more
doaj   +1 more source

FORECASTING AND DETERMINING OF COST PERFORMANCE INDEX OF TUNNELS PROJECTS USING ARTIFICIAL NEURAL NETWORKS

open access: yesInternational Journal for Computational Civil and Structural Engineering, 2022
Construction projects, especially tunnel projects in the Arab world, suffer from poor documentation of data and information, and therefore there is a difficulty in estimating the budget or total costs or indicators of earned value, and with the ...
Oday Hammoody   +3 more
doaj   +1 more source

Project regularity : development and evaluation of a new project characteristic [PDF]

open access: yes, 2017
The ability to accurately characterize projects is essential to good project management. Therefore, a novel project characteristic is developed that reflects the value accrue within a project.
Batselier, Jordy, Vanhoucke, Mario
core   +3 more sources

Agile software development in an earned value world: a survival guide [PDF]

open access: yes, 2016
Agile methodologies are current best practice in software development. They are favored for, among other reasons, preventing premature optimization by taking a somewhat short-term focus, and allowing frequent replans/reprioritizations of upcoming ...
Becla, Jacek   +9 more
core   +2 more sources

Risk factors affecting the ability for earned value management to accurately assess the performance of infrastructure projects in Australia [PDF]

open access: yes, 2019
Purpose – The purpose of this paper is to investigate a set of risk-related factors influencing the earned value management (EVM) concept as an assessment technique in evaluating the progress of modern sustainable infrastructure construction projects.
Ibrahim, Maan Nihad   +2 more
core   +2 more sources