Results 111 to 120 of about 106,010 (167)
For earth pressure balance (EPB) shield tunneling, the stability of tunnel face is controlled by the excavation and discharge rates of soil within tunnel pressure chamber. To ensure continuous discharge of soil from pressure chamber, the soil is required
Xiaochun Zhong +3 more
doaj +1 more source
In situ recycling is one of the most effective methods to dispose of earth pressure balance (EPB) shield waste muck with residual foaming agents with high moisture content.
Yao Lu +5 more
doaj +1 more source
The high permeability of gravel sand increases the risk of water spewing from the screw conveyor during earth pressure balance (EPB) shield tunnelling.
Xingzhong Nong +3 more
doaj +1 more source
With reference to earth pressure balance (EPB) shield tunnelling, the pressure infiltration of foam into saturated sand is investigated through model study.
Bezuijen, Adam +2 more
core +1 more source
Fulfilling the role of a soil conditioner, foam plays a pivotal role in Earth Pressure Balance (EPB) shield tunnelling by enhancing soil properties such as lowering permeability and increasing flowability.
Huang, He +3 more
core +1 more source
Interactions at the front face of EPB shield when drilling in sand
The construction of a tunnel with a tunnel boring machine (TBM) influences the soil in front of the TBM. Excess pore pressures are measured in front of the TBM, which influence the stability of the soil. The magnitude of these pressures depends among others on the soil layering, drilling velocity, permeability of the soil and the pressure in the mixing
openaire +1 more source
Systematic study of effect of cross-drafts and nozzle diameter on shield gas coverage [PDF]
A shield gas flow rate of 15–20 L min21 is typically specified in metal inert gas welding, but is often adjusted to as high as 36 L min21 by welders in practice. Not only is this overuse of shield gas wasteful, but uncontrolled high gas flows can lead to
Campbell, Stuart +5 more
core
Analysis of the Performance of Two Component Back-filling Grout in Tunnel Boring Machines Operating under Face Pressure [PDF]
Schulkins, R. +8 more
core
Expanding the application range of EPB shields using SolidFoam
Marius Schröe +3 more
openaire +1 more source
DEVELOPMENT OF VISUALIZATION SYSTEM FOR SOIL FLOW IN THE CHAMBER OF EPB SHIELD
Atsushi KAGAWA +4 more
openaire +2 more sources