Results 31 to 40 of about 3,607 (160)
Earned Value Method (EVM) for Construction Projects: Current Application and Future Projections
The earned value method (EVM) is an internationally known technique for project management that emphasizes the control of project cost performance and duration, thus allowing trends to be identified during execution and warning the project manager of ...
Mayra Proaño-Narváez +3 more
doaj +1 more source
EVM Prediction for Massive MIMO [PDF]
Signal to interference plus noise ratio (SINR) is a widely common performance metric used in the majority of massive multiple-input, multiple-output (Ma-MIMO) research. This metric requires prior knowledge of the user channel vectors and the interference caused by inaccurate channel state information (CSI).
Boukley Hasan, Wael A G +3 more
openaire +3 more sources
Abstract Aims Population pharmacokinetic (popPK) and pharmacokinetic‐pharmacodynamic (PK/PD) models were developed to support clinical development of nemolizumab, a humanized monoclonal antibody targeting the IL‐31 receptor α, in adolescents and adults with moderate‐to‐severe atopic dermatitis (AD).
Floris Fauchet +17 more
wiley +1 more source
A‐optimal model‐based design of experiments for processes with uncertain inputs
Abstract Model‐based design of experiments (MBDoE) techniques are tools for selecting experimental conditions that enable accurate parameter estimation for mechanistic models. Most MBDoE approaches assume that the selected experimental conditions will be implemented perfectly, without uncertainties in the independent variables.
Bright Ofori +3 more
wiley +1 more source
Cement infill shares compressive and shear stresses during loading, while interfacial friction hinders crack propagation and reduces stress concentration, improving the rock's load‐bearing capacity. Failure modes vary with crack inclination. Unfilled specimens show four modes.
Shihao Yuan +4 more
wiley +1 more source
This study presents the first genomic identification and characterization of ZW sex chromosomes in two soft‐shelled turtle species through genome assembly and resequencing. We reveal the structural organization of ZW chromosomes, identifying both pseudoautosomal regions (PARs) and differentiated regions.
Jianjun Liu +9 more
wiley +1 more source
Completing a project on time and on budget are essential factors for the success of any project. One technique that allows predicting the final cost of a project is earned value management (EVM).
Alexis Barrientos-Orellana +4 more
doaj +1 more source
The Therapeutic Potential of Farm Dust Extracts in a Mouse Model of Eosinophilic Inflammation
Farm dust extract (FDE) treatment reduces airway eosinophilia, mucus overproduction, and MHC‐II expression on DCs, limiting antigen presentation and Th2 inflammation. It increases PD‐L1 on DCs, promoting T cell deactivation. Additionally, FDE enhances Tregs and upregulates CTLA‐4, reinforcing suppression.
Rabia Ülkü Korkmaz +16 more
wiley +1 more source
Survey‐Based Research for Creativity and Innovation Management: Review and Recommendations
ABSTRACT Survey methodology remains a widely used data collection method in creativity and innovation management studies. However, evolving technological advancements and methodological challenges necessitate a reassessment of best practices to benefit the most from it.
Marco Mismetti +2 more
wiley +1 more source
Lean project planning – Bridging last planner system and earned value management
Earned Value Management (EVM) has become a de facto standard for project planning after decades of applications worldwide, and most industry contracts that require some of the reporting features of EVM.
Jan Emblemsvåg
doaj +1 more source

