Results 31 to 40 of about 197,282 (196)

Energy-efficient scheduling of flexible flow shop of composite recycling [PDF]

open access: yes, 2018
Composite recycling technologies have been developed to tackle the increasing use of composites in industry and as a result of restrictions placed on landfill disposal.
A Oyedun   +21 more
core   +2 more sources

Flexible Job Shop Scheduling Problem with Sequence Dependent Setup Time and Job Splitting: Hospital Catering Case Study

open access: yesApplied Sciences, 2021
This paper aims to study a real case of an optimization problem derived from a hospital supply chain. The present work focuses on developing operational decision support models and algorithms for production process scheduling in hospital catering.
Fatima Abderrabi   +6 more
doaj   +1 more source

Fuzzy Flexible-Flow Shops at Two Machine Centers

open access: yesJournal of Advanced Computational Intelligence and Intelligent Informatics, 1998
In simple-flow shop problems, each machine operation center has one machine. If a machine center has more than one machine, scheduling becomes a flexible shop flow problem. Flexible shop flows are thus generalizations of simple shop flow. Processing time for each job was previously assumed to be known exactly, but in many real-world applications ...
Tzung-Pei Hong, Wei-Chou Chen
openaire   +1 more source

A Flexible Flow Shop Modelling as a Distributed Production System [PDF]

open access: yes, 2002
A model of Distributed Production Systems and a formal representation is presented applied to a flexible flow shop. This model is based on recent organizational paradigms like Holonic, Fractal and Bionic production systems. An approach to the problem of resource allocation to production units is developed.
Rui M. Lima, Sílvio do Carmo Silva
openaire   +1 more source

Scheduling Jobs in Flowshops with the Introduction of Additional Machines in the Future [PDF]

open access: yes, 2008
This is the author's peer-reviewed final manuscript, as accepted by the publisher. The published article is copyrighted by Elsevier and can be found at: http://www.journals.elsevier.com/expert-systems-with-applications/.The problem of scheduling jobs to ...
A. Apostolico   +15 more
core   +3 more sources

Identifications of part families and bottleneck parts in celluar manufacturing [PDF]

open access: yesمطالعات مدیریت بهبود و تحول, 2004
Group technology (GT) has emerged as an important scientific philosophy in improving the productivity of manufacturing systems. GT philosophy offers a systems approach to the reorganization of traditional complex job shop and flow shop  manufacturing ...
abolfazl kazazi, seyed ali marashi
doaj  

An investigation into minimising total energy consumption and total completion time in a flexible job shop for recycling carbon fiber reinforced polymer [PDF]

open access: yes, 2015
The increased use of carbon fiber reinforced polymer (CFRP) in industry coupled with European Union restrictions on landfill disposal has resulted in a need to develop relevant recycling technologies.
Liu, Ying, Tiwari, Ashutosh
core   +1 more source

Two-stage dynamic scheduling model for a flexible flow shop using a genetic algorithm: a case study in a truck body manufacturing company

open access: yesTạp chí Khoa học và Công nghệ
Dynamic flexible flow shop scheduling problems present a complex challenge, where new orders arrive stochastically during the current schedule; this uncertainty degrades schedule stability and resource utilization, highlighting the need for responsive ...
Huynh Nhat Trieu   +2 more
doaj   +1 more source

Flexible job-shop scheduling problem with parallel batch machines based on an enhanced multi-population genetic algorithm

open access: yesComplex & Intelligent Systems
The flexible job-shop scheduling problem (FJSP) with parallel batch processing machine (PBM) is one of those long-standing issues that needs cutting-edge approaches. It is a recent extension of standard flexible job shop scheduling problems.
Lirui Xue   +3 more
doaj   +1 more source

Multi-Objective Production and Scheduling Optimization of Offshore Wind Turbine Steel Pipe Piles Based on Improved Hesitant Fuzzy Method

open access: yesJournal of Marine Science and Engineering, 2023
This paper investigates the multi-objective optimization problem in the production of offshore wind turbine steel pipe piles (OWTSPP). Considering the particularity of the steel pipe pile production process, it is divided into a flexible flow shop ...
Weihan Wang   +4 more
doaj   +1 more source

Home - About - Disclaimer - Privacy