Remote fault diagnosis system of fully mechanized mining equipment group based on cloud platform

open access: yesGong-kuang zidonghua, 2021
The currently developed remote fault diagnosis systems for fully mechanized mining equipment are mostly for single-machine equipment such as coal shearers, scraper conveyors and belt conveyors, and for expert remote guidance and maintenance systems based
LI Xu   +4 more
doaj   +1 more source

An Integrated Cloud CAE Simulation System for Industrial Service Applications

open access: yesIEEE Access, 2019
The cloud-based computer-aided engineering (CAE) technology expands the application scope of CAE, solves the problem of uneven distribution, and improves the efficiency of the simulation resources.
Jiacheng Xie   +3 more
doaj   +1 more source

An operation optimization method of a fully mechanized coal mining face based on semi-physical virtual simulation

open access: yesInternational Journal of Coal Science & Technology, 2019
A mathematical hydraulic support self-tracking model for three-machine cooperative mining is proposed to address low efficiency and difficulties in strategy evaluation of a fully mechanized coal face.
Hengbo Shi   +4 more
doaj   +1 more source

Innovative Development and Application of Fully Mechanized Top Coal Caving Mining Technology in Yankuang Group

open access: yesMeikuang Anquan, 2020
This paper systematically summarizes the development process of fully mechanized top coal caving technology and equipment in Yankuang Group in recent 30 years.
MENG Xiangjun, LI Mingzhong, YUE Ning, SUN Jishuang
doaj   +1 more source

A Predictive Maintenance Method for Shearer Key Parts Based on Qualitative and Quantitative Analysis of Monitoring Data

open access: yesIEEE Access, 2019
Appropriate predictive maintenance is critical to shearers under poor working conditions to prevent major safety accidents and casualties. A predictive maintenance method for shearer key parts based on qualitative and quantitative analysis of monitoring ...
Hua Ding, Liangliang Yang, Zhaojian Yang
doaj   +1 more source

Concept, realization path and key technologies of intelligent mining based on transparent longwall face

open access: yesGong-kuang zidonghua, 2020
Taking transparent coal seam, transparent fully-mechanized mining equipment and transparent decision-making and control as core, concept of intelligent mining based on transparent longwall face was put forward, namely based on enhanced geological ...
WANG Feng
doaj   +1 more source

Maintenance decision method considering inspection of mining equipment

open access: yesInternational Journal of Metrology and Quality Engineering, 2021
In coal mining industry, equipment safety and reliability during operation are essential in the production process. In recent years, along with the continuous improvement of intelligent coal mining equipment, reliable production requirements have ...
Cao Xian Gang   +4 more
doaj   +1 more source

Finite Element Analysis and Lightweight Optimization Design on Main Frame Structure of Large Electrostatic Precipitator

open access: yesAdvances in Materials Science and Engineering, 2018
The geometric modeling and finite element modeling of the whole structure of an electrostatic precipitator and its main components consisting of top beam, column, bottom beam, and bracket were finished. The strength calculation was completed. As a result,
Xuewen Wang, Bo Li, Zhaojian Yang
doaj   +1 more source

Research on key technology of intelligent fully mechanized caving face construction in Baode Coal Mine

open access: yesGong-kuang zidonghua, 2023
The current research achievements in the construction of intelligent fully mechanized caving face lack systematic implementation case for a specific fully mechanized caving face.
WU Xicang   +3 more
doaj   +1 more source

Probe on concept of automatic fully-mechanized coal mining face

open access: yesGong-kuang zidonghua, 2014
Technology status of automatic fully-mechanized coal mining face in China was introduced, and fully-mechanized coal mining equipments were classified into production equipment, auxiliary equipment and monitoring and control system.