Tingkat kerumitan dan kompleksitas dalam setiap pembangunan proyek konstruksi bertambah dengan konstan, sehingga melakukan optimasi waktu dan biaya dengan alokasi sumber daya tertentu menjadi suatu hal yang funndamental.
Setiono Setiono +2 more
semanticscholar +2 more sources
Visual Analysis of Resident Behavior Characteristics Based on Spatio-Temporal Data [PDF]
Owing to the rapid development of smart cities, a significant number of commercial areas will generate plenty of resident behavior data daily.However, classical analysis methods cannot easily overcome data sparsity, and spatio-temporal adjoint relation ...
MA Xiaodong, ZHAO Fan, REN Pengkun
doaj +1 more source
Dynamic rationing using agent-based modeling of the assembly process of equipment for nuclear power plants [PDF]
The work is raised as an agent-based model designed to calculate the time spent on the assembly stage of the manufacturing process for manufacturing equipment for nuclear power plants.
I. A. Loskutov +2 more
doaj +1 more source
Objective To analyze problems existing in the management of the transformation of scientificand technological achievement in our hospital, and to realize the continuous improvement of service quality through project management.
Zhang Ying +3 more
doaj +1 more source
Proyek-proyek pengembangan perangkat lunak seringkali mengalami kegagalan karena tidak terpenuhinya batasan ruang lingkup, biaya dan waktu. Pada CV Gumcode Indonesia beberapa proyek mengalami keterlambatan dan kelebihan biaya karena metode perhitungan ...
Mochamad Chandra Saputra +2 more
doaj +8 more sources
Optimization of the Technology Transfer Process Using Gantt Charts and Critical Path Analysis Flow Diagrams: Case Study of the Korean Automobile Industry [PDF]
This research is focused on the technology transfer process in the automobile industry using project management tools. The aim of this research is the development of a technology-transfer model using Gantt charts and Critical Path Analysis flow diagrams to achieve a sustainable planning process in the global environment.
Sangkon Lee, Olga A. Shvetsova
openaire +1 more source
PENJADWALAN PROYEK DENGAN KURVA-S PADA PEMBANGUNAN PERUMAHAN DI KOTA BEKASI
Dalam proyek konstruksi terdapat beberapa jenis model instrumen penjadwalan yang biasa digunakan baik untuk proyek yang berskala kecil sampai yang besar baik yang bersifat formal maupun non formal.
Dinda Sulistia, Ida Deliyarti Agustina
semanticscholar +1 more source
Increasing the Efficiency and Productivity in the Production of Low Voltage Switchboard Using Resource Constrained Project Scheduling [PDF]
Purpose: This research was made with the aim to give a scheduling proposal for the assembly activity and the proposal to allocate those activities into available resources using the resource-constrained project scheduling.
Maimury, Yona, Tannady, Hendy
core +10 more sources
This paper presents the integration of mixed-integer nonlinear program (MINLP) and project management tool (PMT) to support sustainable cost-optimal construction scheduling.
B. Dasović, U. Klanšek
semanticscholar +1 more source
The problem The with development projects is to determine the project schedule so that it can be completed in an optimal (minimum) time. Scheduling with Network, among others, uses the CPM (Critical Path Method).
B. Karomah
semanticscholar +1 more source