Results 231 to 240 of about 42,721 (268)
Some of the next articles are maybe not open access.
Flow Equations for Natural Gas Pipelines
Transactions of the American Society of Civil Engineers, 1958In use of various equations in pipe line design, practice is to apply Pipeline Efficiency factor; three equations most widely used for design are given; use of equations in operation study and capacity testing; difference between flow equation; determining behavior of resistance coefficient.
openaire +1 more source
Process Safety Progress
AbstractIndustrial accidents include fire, explosion, and toxic substance spread involving hazardous substances. They threaten the health of many people, cause permanent or long‐term pollution of the natural environment, cause a high degree of property damage, and require a large‐scale emergency response.
Saliha Cetinyokus, Duran Dinc, Sila Ata
openaire +2 more sources
AbstractIndustrial accidents include fire, explosion, and toxic substance spread involving hazardous substances. They threaten the health of many people, cause permanent or long‐term pollution of the natural environment, cause a high degree of property damage, and require a large‐scale emergency response.
Saliha Cetinyokus, Duran Dinc, Sila Ata
openaire +2 more sources
Inspection robots for gas pipelines of Tokyo Gas
Advanced Robotics, 2001Mitsunori Komori, Kiichi Suyama
openaire +1 more source
Leakage and diffusion behavior of a buried pipeline of hydrogen-blended natural gas
International Journal of Hydrogen Energy, 2023Yuxing Li, Jianlu Zhu
exaly
2013
Nel 1947, la Compagnia Tecnica Internazionale (Techint) fondata in quello stesso anno da Agostino Rocca ottiene il suo primo contratto importante: la realizzazione di un gasdotto dalla Patagonia a Buenos Aires. Si trattava di depurare il metano estratto nella regione di Santa Cruz e, dopo averlo convogliato a Pico Truncado, spingerlo dal 50° al 35 ...
openaire +1 more source
Nel 1947, la Compagnia Tecnica Internazionale (Techint) fondata in quello stesso anno da Agostino Rocca ottiene il suo primo contratto importante: la realizzazione di un gasdotto dalla Patagonia a Buenos Aires. Si trattava di depurare il metano estratto nella regione di Santa Cruz e, dopo averlo convogliato a Pico Truncado, spingerlo dal 50° al 35 ...
openaire +1 more source
Leakage diagnosis and localization of the gas extraction pipeline based on SA-PSO BP neural network
Reliability Engineering and System Safety, 2023Shihao Liu, Hongwei Jin
exaly
Leakage detection techniques for oil and gas pipelines: State-of-the-art
Tunnelling and Underground Space Technology, 2020Hongfang Lu, Lingdi Fu
exaly

