Results 71 to 80 of about 871 (136)
Technical Report for Research Unit FOR-1511 [PDF]
This technical report presents the interim results of the DFG research unit FOR1511 "Protection and Control Systems for Reliable and Secure Operation of Electrical Transmission Systems"
Brato, Sebastian +8 more
core
Visions of energy transition focus on activating end users, meaning that numerous flexible-distribution network-level devices become active participants in power-system operations.
Goran Jurišić +3 more
doaj +1 more source
Modelagem do Ataque Grayhole ao Protocolo de Comunicação GOOSE usando o Framework ERENO [PDF]
The growing need to enhance cybersecurity in critical infrastructure, specifically in electric substations that communicate via the Generic Object Oriented Substation Event (GOOSE) protocol, calls for effective threat detection and prevention techniques.
Gonçalves, Jerusa Carneiro
core
Application of Advanced Early Warning Systems with Adaptive Protection [PDF]
This project developed and field-tested two methods of Adaptive Protection systems utilizing synchrophasor data. One method detects conditions of system stress that can lead to unintended relay operation, and initiates a supervisory signal to modify ...
Ashrafi, Frank +7 more
core
Scenarios for the development of smart grids in the UK: literature review [PDF]
Smart grids are expected to play a central role in any transition to a low-carbon energy future, and much research is currently underway on practically every area of smart grids.
Axon, Colin +8 more
core +5 more sources
Evaluation of Time-Critical Communications for IEC 61850-Substation Network Architecture
International audiencePresent-day developments, in electrical power transmission and distribution, require considerations of the status quo. In other meaning, international regulations enforce increasing of reliability and reducing of environment impact,
Altaher, Ahmed +2 more
core
Modeling and simulation of IEC 61850 requirements applied to an automated people mover's controller [PDF]
Automated People Movers (APM) are systems for passenger transport with fully automated operation and high frequency service. For this study, we proposed the adaptation of the standard IEC 61850 (design to be used in electric power systems based in ...
Kunz, Guilherme +2 more
core
Explainable Autoencoder-Based Anomaly Detection in IEC 61850 GOOSE Networks
The IEC 61850 Generic Object-Oriented Substation Event (GOOSE) protocol plays a critical role in real-time protection and automation of digital substations, yet its lack of native security mechanisms can expose power systems to sophisticated cyberattacks.
Dafne Lozano-Paredes +4 more
doaj +1 more source
Transfer the IEC 61850 standard for communication protocol ModBus [PDF]
Předkládaná práce se zabývá popisem komunikačního protokolu ModBus používaného v dřívějších i nynějších rozvodnách vysokého napětí. Dále popisem IEC 61850, který standardizovala komunikační protokol pro většinu výrobců rozvodných zařízení, typu ABB ...
Šikula, Jiří
core
Exploring Cross-Substation Transfer Learning for Improving Cybersecurity in IEC 61850 Substations
The information security of IEC 61850-compliant substations is a growing concern for researchers and industry practitioners. IEC 62351, developed to address such concerns, recommends the use of intrusion detection systems (IDSs) as a defense, prompting ...
Filip Natvig +2 more
doaj +1 more source

