Results 11 to 20 of about 7,865 (221)

Investigation of the dynamics of an overhead crane lifting process in a vertical plane [PDF]

open access: yesTransport, 2005
The paper analyses the dynamic behaviour of supporting structure of an overhead crane during the operation of a hoisting mechanism. The crane is expected to operate with a hook and to carry 50 kN of weight. The electric hoist consists of an asynchronous
M. Bogdevičius, A. Vika
doaj   +3 more sources

Impact analysis of bucket capacity and boom length of mining excavators on hoisting mechanism life [PDF]

open access: yesE3S Web of Conferences, 2021
The presented article considers the influence of the design parameters of the work equipment being the boom length and bucket capacity on the operating life of the hoisting mechanism of a mining excavator.
Kuvshinkin Sergey, Ivanova Polina
doaj   +1 more source

NEW CRANE BUMPER DESIGN WITH AN ENERGY ABSORPTION DEVICE SYSTEM [PDF]

open access: yesTransport Problems, 2022
This article presents research carried out using physical data from the experimental construction of an overhead crane. This article aims to determine the dynamic behaviour of the cart-pendulum system when the hoisting mechanism hits the new bumper ...
Tomasz HANISZEWSKI   +3 more
doaj   +1 more source

Investigative study of hoisting machine loading when using frequency converter controlling systems [PDF]

open access: yesНаучно-технический вестник Брянского государственного университета, 2018
The paper deals with the impact of the controlling system adjustment on the level of the dynamic loads operating on the hoisting machine parts during the period of the non-steady motion.
Goncharov K.A., Denisov I.A.
doaj   +1 more source

Integrated Modelling and Simulation Method for the Project-Type Manufacturing Process: Shipyard Dock Shop Hoisting Process

open access: yesIEEE Access, 2021
The dock shop hoisting process is the bottleneck stage of the entire shipbuilding lifecycle, with a crucial influence on a shipyard’s competitive goals of cost and delivery time.
Mindong Liu, Zhonghua Yang, Mei Meng
doaj   +1 more source

Investigation of Dynamic Load in Superdeep Mine Hoisting Systems Induced by Drum Winding

open access: yesShock and Vibration, 2021
Blair mine hoists powered by drum winding are a key equipment in the transportation of a superdeep mine shaft. The step changes of hoisting velocity and acceleration caused by coil and layer crossover of rope winding on the LeBus drum, which will excite ...
Jiannan Yao   +3 more
doaj   +1 more source

Drive electrical parameters applicability evaluation to determine loads on bridge crane lifting mechanism

open access: yesВестник СибАДИ, 2022
Introduction. The problem of existing recorders of crane operation parameters in the direction of determining the intensity of work of mechanisms is revealed. The necessity of increasing the number of information sources is determined.
S. D. Ivanov, A. N. Nazarov
doaj   +1 more source

Vibrodiagnostics of hoisting crane mechanisms using simulation modeling

open access: yesIOP Conference Series: Materials Science and Engineering, 2021
Abstract The subject of the research is an opportunity to increase the efficiency of vibration diagnostics of hoisting cranes through the use of simulation of the vibration signal. In the article the basic approaches developed by the authors to construction of the type diagram of a mechanism and modeling of a vibrating signal of the ...
A Yu Ganshkevich, Ph O Fadeev
openaire   +1 more source

Motor driving force of bridge-type crane lifting mechanism under real operating use

open access: yesВестник СибАДИ, 2023
Introduction. The requirement for modelling the dynamic processes of a hoisting mechanism in real operating situations has been revealed. The necessity of increasing the accuracy of moving effort description for the most common types of crane hoist drive
A. N. Nazarov
doaj   +1 more source

Use of weight measurement algorithm on the basis of moving average filter in the recorder of overhead crane operation parameters

open access: yesВестник СибАДИ, 2023
Introduction. The problem of primary information low quality of crane operation parameters recorders is analyzed. The accepted direction to improve the quality of information about the mass of the cargo is to improve the algorithm of weight measurement ...
A. N. Nazarov, S. D. Ivanov
doaj   +1 more source