Results 251 to 256 of about 32,492 (256)
Some of the next articles are maybe not open access.

Hybrid flow shop scheduling with precedence constraints and time lags to minimize maximum lateness

International Journal of Production Economics, 2000
Valerie Botta-Genoulaz
exaly  

An effective hybrid DE-based algorithm for flow shop scheduling with limited buffers

International Journal of Production Research, 2009
Bin Qian
exaly  

A branch and bound algorithm for hybrid flow shop scheduling problem with setup time and assembly operations

Applied Mathematical Modelling, 2014
Parviz Fattahi   +2 more
exaly  

Home - About - Disclaimer - Privacy