Results 11 to 20 of about 1,027,546 (279)
Surface tension: permeability, the body, and installation
Surface Tension – Permeability, the Body, and Installation, is comprised of a multimedia installation and an accompanying minor thesis. The concurrent points of departure for both are the body and the medium of installation itself, exploring their sympathies with the lens of permeability.
Ducray, Luke
core +3 more sources
Port and installation constraints of Tension Leg Platforms (TLP) floating wind turbines [PDF]
Floating offshore wind needs to go from pre commercial phase to full commercial use if it’s full benefits are to be realised. The port and installation requirements for barge, semi submersible and Spar substructure types are understood, though more ...
PR Thies (21843683), A Crowle (21928691)
core +3 more sources
: Anchor serves to connect steel and concrete construction that can transfer steel pull-out load to concrete. Sanko hammer drive anchor usually has been available in the model of expansion that can be installed into concrete with cast in place and post ...
Henry Apriyatno +2 more
doaj +1 more source
A rational cubic spline with tension [PDF]
A rational cubic spline curve is described which has tension control parameters for manipulating the shape of the curve. The spline is presented in both interpolatory and rational B-spline forms, and the behaviour of the resulting representations is ...
Gregory, JA, Sarfraz, M
core +4 more sources
Polynomial cubic splines with tension properties [PDF]
In this paper we present a new class of spline functions with tension properties. These splines are composed by polynomial cubic pieces and therefore are conformal to the standard, NURBS based CAD/CAM ...
Costantini, P. +2 more
core +4 more sources
Critical Water Depth and Installation Curves for Submarine Cable Deployment Process
The purpose of the present paper is to propose installation curves for submarine cable deployment process for different water depths and tension deployment, emphasizing on the importance of modelling the “out of water” cable segment and the friction ...
Vasileios A. Mamatsopoulos +3 more
doaj +1 more source
A Study on the Estimations of the Tension of the Overhead Wires Using Data from Acceleration Sensors
One of the important tasks of the distribution system is to operate the distribution system in consideration of the safety. It is also important to minimize and prevent possible failures in the distribution system.
Jun-Hyeok Kim +2 more
doaj +1 more source
Realization of a multihop wireless controlled sensor and actuator network for cable installation
Long and heavy cables need to be laid during the construction of plant. The present-day cable installation system drives the cables through by power assistance in order to reduce physical stress on the workers.
Masahiro Watanabe
doaj +1 more source
Numerical analysis of installation damage of a pre-damaged geogrid with rectangular apertures
The geogrid can be damaged in the process or during construction if sufficient care is not exercised. In this study, the numerical software-FLAC was adopted to investigate the responses of pre-damaged geogrids with rectangular apertures when subjected to
Yan-li Dong +3 more
doaj +1 more source
Calculation and Analysis on Jumper Length of the Six-Bundle Jumpers in UHVDC [PDF]
[Objective] To improve the calculation accuracy of the jumper length for six-bundle jumpers in ultra-high voltage direct current (UHVDC) transmission lines and to efficiently achieve prefabricated installation of the jumpers, a precise calculation method
DUAN Fuping, LIU Da, LÜ Duo, XIAO Feng, WU Haoting, WANG Jingjing
doaj +1 more source