A classification of predictive-reactive project scheduling procedures. [PDF]
The vast majority of the project scheduling research efforts over the past several years have concentrated on the development of workable predictive baseline schedules, assuming complete information and a static and deterministic environment.
Herroelen, Willy +2 more
core
A Two-Workshop Collaborative, Integrated Scheduling Algorithm considering the Prescheduling of the Root-Subtree Processes. [PDF]
Xie Z, Teng H, Ming J, Yue X.
europepmc +1 more source
Modelling of integrated scheduling problem of capacitated equipment systems with a multi-lane road network. [PDF]
Luan D, Zhao M, Zhao Q, Wang N.
europepmc +1 more source
Integrated Robust Airline Schedule Development
In air transportation, airline profitability is influenced by the airline's ability to build flight schedules. In order to generate operational schedules, airlines engage in a complex decision-making process, referred to as airline schedule planning. Up to now, the generation of flight schedules has been separated and optimized sequentially.
Cadarso Morga, Luis +1 more
openaire +2 more sources
Vehicle and crew scheduling: solving large real-world instances with an integrated approach
In this paper we discuss several methods to solve large real-worldinstances of the vehicle and crew scheduling problem. Although,there has been an increased attention to integrated approaches forsolving such problems in the literature, currently only ...
Huisman, D., Groot, S.W. de
core
CONTRIBUTIONS TO MULTI-AGENT SYSTEMS IMPLEMENTATION FOR PROJECT SCHEDULING [PDF]
Increasing project complexity makes scheduling problems more difficult to solve and requires more versatile algorithms. Two different approaches for the project scheduling optimization could be considered: TCPSP (Time-Constrained Project Scheduling), and
Ileana Ruxandra BADEA +1 more
core
The trade-off between stability and makespan in resource-constrained project scheduling. [PDF]
During the last decade, considerable research efforts in the project scheduling literature have concentrated on resource-constrained project scheduling under uncertainty.
Herroelen, Willy +3 more
core +2 more sources
Collaborative optimization has received much attention from both research and industry communities for its significant profits. However, the current researches primarily concentrate on optimizing individual subprocesses of refinery operations.
Yuandong Chen +5 more
doaj +1 more source
A hybrid scatter search. Electromagnetism meta-heuristic for project scheduling. [PDF]
In the last few decades, several effective algorithms for solving the resource-constrained project scheduling problem have been proposed. However, the challenging nature of this problem, summarised in its strongly NP-hard status, restricts the ...
Debels, D +3 more
core
Integrated Workshop Schedule [PDF]
openaire +1 more source

