Results 131 to 140 of about 5,212 (168)

[<sup>89</sup>Zr]bevacizumab PET/CT imaging of vestibular schwannomas for the prediction of bevacizumab treatment effect in patients with symptomatic <i>NF2</i>-related schwannomatosis: a study protocol for a phase II single centre, prospective, feasibility trial. [PDF]

open access: yesBMJ Open
Douwes JPJ   +16 more
europepmc   +1 more source

Report of the WPA Scientific Section on Quality Assurance in Psychiatry. [PDF]

open access: yesWorld Psychiatry
Gaebel W   +3 more
europepmc   +1 more source

CMM and ISO 9001

Software Process: Improvement and Practice, 1996
In their own ways, both ISO 9001 and the Capability Maturity Model (CMM) have provided guidance and urgency to the improvement of software processes. However, there is a point where each calls for statistical analysis of the performance of the processes in use, treating software development as a manufacturing activity. This paper argues that this is an
openaire   +1 more source

ISO 9001:1994 and ISO 9001:2000 compared

Manufacturing Engineer, 2002
It is likely that the amount of effort needed for the transition of an existing ISO 9001:1994 system to ISO 9001:2000 will be approximately the same as obtaining registration in the first place. There are five major conceptual changes that will significantly impact existing 1994 systems: process based, customer focus, measurement, improvement, and top ...
openaire   +1 more source

Home - About - Disclaimer - Privacy