Research on Technology of Supporting in Super-Large Section Cut in Working Face with Large Mining Height [PDF]
For the support problem of the super-large section cut in working face with large mining height, the 1105 cut pilot chamber of Zhaogu No. 2 Mine, the roof strata structure detection and the strata movement rule research were conducted.
Zhicheng Ren, Minghui Zuo
doaj +3 more sources
The Effect of Joint Damage on a Coal Wall and the Influence of Joints on the Abutment Pressure on a Fully Mechanised Working Face with Large Mining Height [PDF]
Coal wall spalling is regarded as a key technical problem influencing safe and efficient mining of large-mining-height working faces while the distribution of abutment pressure within the limit equilibrium zone (LEZ) influences coal wall spalling within ...
Weibin Guo, Shengwei Zhang, Yuhui Li
doaj +3 more sources
Coal mining has gradually entered the deep mining era, and large-height mining is an important way to mine thick coal seams in the deep. The high coal wall will inevitably make the distribution of the overburden structure in the coal mining face more complicated, and the large buried depth will also cause more intense mine pressure.
Haijian Su
exaly +3 more sources
Using unified model and theory of rock pressure, the problems, such as caving of stope roof with large mining height and destruction of support, strata movement and surface subsidence, are unified analyzed and researched. The results show that: pressure shell is dynamic shell, which moves forward with the propulsion of working face; with the increase ...
Ying Ma, Sheng Zhong
exaly +3 more sources
Double-roadway tunneling could mitigate the contradiction between mining production needs and tunneling speed, which is pivotal to the sustainable development of underground mines. However, it is very difficult to control the stability of a mining roadway on an adjacent working face suffering from strong mining disturbance due to double-roadway ...
Deyu Qian, J X Yang, Qian Deyu
exaly +3 more sources
Theory of coal wall spalling and cooperative control by “support-destressing” in 10 m ultra-large mining height working face [PDF]
Coal wall spalling is one of the main factors restricting the safe production of 10 m ultra-large mining height working face.In response to the problem of unclear mechanism of coal wall spalling and difficult control of surrounding rock in the 10 m ultra-
Jiangbin LIU +7 more
doaj +3 more sources
Aiming at the problem of safe coal mining under the sandstone aquifer covering Luohe Formation in the thick coal seam mining face of Xunyao Mining Area, theoretical analysis, similar material test and numerical simulation were used to study the ...
YANG Yuliang, XU Zhuhe
doaj +3 more sources
In mining, the roof structure of a working face with a large mining height in a shallow‐buried coal seam is prone to cutting instability in front of the support, which causes support crushing and coal‐wall spalling. This study analyzes 2201 working faces
Wang Hongwei +7 more
doaj +3 more sources
Prevention Technology for Strong Mine Pressure Disaster in the Hard-Roof Large-Mining-Height Working Face [PDF]
The movement and destruction of the hard roof in a stope is an important reason for the occurrence of strong ground pressure disasters at the working face. Considering Tongxin Coal Mine as the engineering background, the stress distribution law of the surrounding rock and the overburden rock damage characteristics of a large-mining-height working face ...
Hongfei Duan, Lijuan Zhao
openaire +3 more sources
Aiming at the wide range of rock strata movement and collapse, poor stability and high damage rate of the working face support and being prone to crushing of the support in large mining height face, analog simulation, theoretical analysis, and field ...
Fengfeng Wu +5 more