Results 231 to 240 of about 4,409 (252)

Numerical Simulation of Strata Behavior in Super-Long and Large Mining Height Working Face

Advanced Materials Research, 2013
In order to study the strata behavior characteristics in super-long and large mining height working face, the FLAC-3D software was used to study the roof displacement and the abutment pressure distribution laws of working faces. The results indicate that: ① the influence range is larger of front abutment pressure in Liuzhuang coal mine 171301 super ...
Zhi Hua Li, Li Zhi Hua
exaly   +2 more sources

Research and Application of Roof Cutting and Pressure Release Technology of Retracement Roadway in Large Height Mining Working Face

Geotechnical and Geological Engineering, 2020
In this paper, according to problems of large deformation, high stress and strong disturbance exist in the retracement roadway during the equipment withdrawal of 18,205 large height mining working face in Xiegou mine. The method of roof cutting and pressure release by deep-hole blasting is put forward.
Yufeng Guo, Hong Yu
exaly   +2 more sources

Full-floor Grouting Reinforcement for Working Faces with Large Mining Heights and High Water Pressure: a Case Study in China

Mine Water and the Environment, 2020
Grouting reinforcement was used to safely and efficiently exploit the thick coal seam in the Jiaozuo coalfield. First, the water inrush possibility of the 11,050 working face was evaluated, using both the floor failure depth and the water bursting coefficient (T) methods.
Shiqi Liu   +4 more
openaire   +1 more source

Research on Rational Width of Entry Protection Coal-Pillar in Large Mining Height Work-Face of Shallow Coal Seam

Advanced Materials Research, 2014
For the study on the problem of rational width of entry protection coal-pillar, according to the gateway of 5103 mining face in Heshan Mine, through theoretical calculation and numerical simulation, rational width of entry protection coal-pillar was educed, which was 25 m.
Xin Bin Xu, Bang Jun Wang, Ting Feng Cui
openaire   +1 more source

Causation Analysis of Roof Cutting and Support Crushing in Shallow-Buried Large Mining Height Long Wall Working Face of Western China

Advanced Materials Research, 2012
During the mining process of shallow buried long wall working face, the breaking of main roof easily result in fracture belt’s connectivity with the surface. The paper has studied the causation of roof cutting and support crushing in shallow-buried large mining height long wall working face of Suancigou coal mine which is in Ordos Inner Mongolia.
Yan Fang Ren   +3 more
openaire   +1 more source

Technical parameters of drawing and coal-gangue field movements of a fully mechanized large mining height top coal caving working face

Mining Science and Technology (China), 2009
Under fully mechanized, large mining height top coal caving conditions, the shield beam slope angle of the support increases due to the enlargement of the top coal breaking and caving space. This results in a change of the caving window location and dimensions and, therefore, the granular coal-gangue movement and flows provide new characteristics ...
Chang-you LIU   +2 more
openaire   +1 more source

Home - About - Disclaimer - Privacy