Results 201 to 210 of about 178,669 (258)

Cost-effectiveness analysis of transcatheter aortic valve implantation for asymptomatic severe aortic stenosis across nine European countries. [PDF]

open access: yesEur Heart J Open
Genereux P   +17 more
europepmc   +1 more source

Life Cycle Costing

open access: yesJournal of The Japanese Society for Quality Control, 1977
openaire   +1 more source

Life Cycle Costing

European Procurement & Public Private Partnership Law Review, 2020
Life Cycle Costing bezeichnet die Gestaltung von objektbezogenen Masnahmen uber den Lebenszyklus dieser Objekte hinweg mit dem Ziel der wirtschaftlichen Optimierung.
L. Michaux, J. Gruyters
openaire   +2 more sources

Costing of Aluminium for Life Cycle

46th AIAA Aerospace Sciences Meeting and Exhibit, 2008
Aluminium alloys are a key series of metallic materials used in aerospace engineering. Life cycle of aluminium consists of a series of independent product processes including, for example, bauxite mining, bauxite refining, smelting, casting, forming, performing, and disposal.
Tan, Xincai Cato   +5 more
openaire   +1 more source

Life cycle costs. The importance of the users' costs

IABSE Reports, 2019
<p>The aim of this paper is to present a methodology that allows the quantification of the users’ costs in bridge life cycle costs analysis. This model, created for concrete roadway bridges, allows the quantification of the users’ costs in a swift and intuitive way.
Almeida, J. C.   +2 more
openaire   +2 more sources

Life cycle costing

Property Management, 1990
Defines life cycle costing, which gives rise to Life Cycle Cost (LCC). Defines LCC as “The total cost of the system or product under study over its complete life cycle or the duration of the period of study, whichever is the shorter”. Stresses that LCC can be used at whatever level is chosen (estate or, say, a boiler). Explains the timing and mechanism
openaire   +1 more source

Life Cycle Costing

1994
In an ideal situation everything in a building falls apart the day after the user has left for the last time and the building is about to be demolished or at least to be substantially refurbished. In common with all ideals the goal is not achievable and we then strive to get ever closer to the perfect solution.
openaire   +1 more source

Home - About - Disclaimer - Privacy