Results 221 to 230 of about 7,827,883 (285)
Some of the next articles are maybe not open access.

Related searches:

Main Cable Inspection and Strength Evaluation of Helicoidal Strand Main Cables Using a Modified NCHRP Evaluation Approach

IABSE Reports, 2023
<p>The A. Murray MacKay Bridge (MacKay Bridge) opened to traffic in 1970 and carries four lanes of traffic over the Halifax Harbour between Dartmouth and downtown Halifax, Nova Scotia, Canada. The Bridge's main cable has been opened for detailed visual inspections several times beginning in 2002.
Jorge Pérez Armiño, Ahsan Chowdhury
openaire   +1 more source

Main Cable Preservation for the Williamsburg Bridge

Structural Engineering International, 1994
This paper describes the method used to preserve the main cable of the Williamsburg Bridge in New York. The preservation system used was a penetrating liquid corrosion inhibitor, a red lead paste coating, a non galvanized wire wrapping and a neoprene outer wrapping system. Details are provided of the methods used to: a) oil; b) compact; and c) wrap the
Maria Grazia Bruschi, Terry L. Koglin
openaire   +1 more source

Tension Force Monitoring of Main Cable

2018
As a type of critical infrastructure, long-span bridges are usually vital to the local traffic around the world. Structural health monitoring (SHM) techniques have often been applied to assess the conditions of these important structures.
Yang Deng, Aiqun Li
openaire   +1 more source

ShiZiYang Bridge – Large diameter main cables

IABSE Congress Reports, 2022
<p>The ShiZiYang suspension bridge in the GuangDong province in China will when constructed have a world record main span of 2180 m and carry an impressive 2 x 8 lanes of traffic on the two levels truss girder.</p><p>Due to its size, ShiZiYang bridge requires extensive main cable area with diameter nearly 1.5 m representing the ...
Jakub Duris   +3 more
openaire   +1 more source

Main Cables of Newport Suspension Bridge

Journal of the Structural Division, 1971
A description is given of the successful construction of the first set of bridge cables using prefabricated and reeled parallel-wire strands in the suspension bridge of the Newport Bridge. Some sort of prequalification, or bidding by selective invitation, is recommended for the forseeable future.
openaire   +1 more source

Home - About - Disclaimer - Privacy