Results 1 to 10 of about 857,611 (296)

Pantograph and Catenary Arc under Stiff Contact Wires of 120 km/h Metro Vehicles

open access: yes机车电传动, 2015
Aiming at the 120 km/h vehicles pantograph and catenary arc of Guangzhou metro line 3 north-extension section, thearc generation cause was analyzed, and the pantograph and catenary model was built. With the simulation from the pantograph and thecatenary,
ZHOU Dalin, GAO Wei, ZHENG Xuan
doaj  

Study on Optimal Allocation Method of Regenerative Braking Energy Feedback System

open access: yes机车电传动, 2018
A simulation method of the urban rail traction power supply system including medium voltage energy feedback device for Xuzhou metro line 1 was introduced. The power flow analysis was carried out on the whole line power supply system, and the influence of
YANG Liqiang
doaj  

Home - About - Disclaimer - Privacy