Results 171 to 180 of about 2,940,613 (295)

Optimal Scheduling for Laboratory Automation of Life Science Experiments with Time Constraints. [PDF]

open access: yesSLAS Technol, 2021
Itoh TD   +4 more
europepmc   +1 more source

Dual Priority Scheduling is Not Optimal.

open access: yes, 2019
In dual priority scheduling, periodic tasks are executed in a fixed-priority manner, but each job has two phases with different priorities. The second phase is entered after a fixed amount of time has passed since the release of the job, at which point the job changes its priority.
openaire   +4 more sources

Hydrogel platforms for 3D cardiac tissue engineering and fibrotic disease modelling

open access: yesFEBS Open Bio, EarlyView.
Hydrogel‐based cardiac tissue models are advancing our understanding of heart health and disease. By incorporating electrical conductivity, aligned structures, and tunable mechanical properties, these platforms better replicate the complex environment of native heart tissue.
Harrison Porritt   +2 more
wiley   +1 more source

Optimal Scheduling of Campus Microgrid Considering the Electric Vehicle Integration in Smart Grid. [PDF]

open access: yesSensors (Basel), 2021
Nasir T   +8 more
europepmc   +1 more source

Operating room planning and scheduling: A literature review. [PDF]

open access: yes
This paper provides a review of recent research on operating room planning and scheduling. We evaluate the literature on multiple fields that are related to either the problem setting (e.g.
Belien, Jeroen   +2 more
core  

Chronobiology of Cancer: How Aging Fuels Oncogenesis at the Molecular Level

open access: yesAging and Cancer, EarlyView.
This graphical abstract illustrates the key biological pathways linking aging with cancer development and progression. In the upper left, cumulative exposure to ultraviolet radiation, toxins, and reactive oxygen species (ROS) causes DNA damage and genomic instability, whereas age‐related decline in repair mechanisms, such as ATM/ATR, BER, and NER ...
Anu Singh, Aroonima Misra, Sufian Zaheer
wiley   +1 more source

Algorithms for scheduling projects with generalized precedence relations. [PDF]

open access: yes
Project scheduling under the assumption of renewable resource constraints and generalized precedence relations, i.e. arbitrary minimal and maximal time lags between the starting and completion times of the activities of the project, constitutes an ...
De Reyck, B   +2 more
core  

Home - About - Disclaimer - Privacy