The results of additional Class 3 cultural resources surveys for the Pinal West to Dinosaur Extra-high Voltage Transmission Line Project are presented in this report. The transmission line is being constructed by the Salt River Project Agricultural Improvement and Power District (SRP); it will link the Pinal West, Santa Rosa, Pinal Central, Abel, and ...
openaire +1 more source
The results of additional Class 3 cultural resources surveys for the Pinal West to Dinosaur Extra-high Voltage Transmission Line Project are presented in this report. The transmission line is being constructed by the Salt River Project Agricultural Improvement and Power District (SRP); it will link the Pinal West, Santa Rosa, Pinal Central, Abel, and ...
openaire +1 more source
2007
This report presents the results of Class III cultural resources surveys conducted for the Palo Verde to Pinal West Transmission Line Project. The work was sponsored by Salt River Project (SRP) in support of two proposed 500 kV transmission lines that will connect the existing Hassayampa Switchyard, west of Phoenix, Maricopa County, Arizona, and the ...
openaire +1 more source
This report presents the results of Class III cultural resources surveys conducted for the Palo Verde to Pinal West Transmission Line Project. The work was sponsored by Salt River Project (SRP) in support of two proposed 500 kV transmission lines that will connect the existing Hassayampa Switchyard, west of Phoenix, Maricopa County, Arizona, and the ...
openaire +1 more source
2007
Salt River Project Agricultural Improvement and Power District (SRP) plans to construct a new 500 kV transmission line between the existing Hassayampa Switchyard, west of Phoenix, Maricopa County, Arizona, and the proposed Pinal West Substation, western Pinal County, Arizona (Figure 1). Designated the Palo Verde to Pinal West (PV-PW) transmission line,
openaire +1 more source
Salt River Project Agricultural Improvement and Power District (SRP) plans to construct a new 500 kV transmission line between the existing Hassayampa Switchyard, west of Phoenix, Maricopa County, Arizona, and the proposed Pinal West Substation, western Pinal County, Arizona (Figure 1). Designated the Palo Verde to Pinal West (PV-PW) transmission line,
openaire +1 more source
2004
Greystone Environmental Consultants, Inc., on behalf of Salt River Project Agricultural Improvement and Power District (SRP), has developed this Class I Cultural Resources Inventory for the Pinal West to Southeast Valley/Browning 500 kV Project (Project) as part of the Certificate of Environmental Compatibility (CEC) Application.
openaire +1 more source
Greystone Environmental Consultants, Inc., on behalf of Salt River Project Agricultural Improvement and Power District (SRP), has developed this Class I Cultural Resources Inventory for the Pinal West to Southeast Valley/Browning 500 kV Project (Project) as part of the Certificate of Environmental Compatibility (CEC) Application.
openaire +1 more source