Results 11 to 20 of about 833 (115)
This paper presents results of research concerning determination of the GPS reference station coordinates located on the grounds of an EPDE airport in Deblin.
Kamil Krasuski, Stepan Savchuk
doaj +1 more source
Operation mode selection of NIMBY facility Public Private Partnership projects.
Construction of not in my back yard (NIMBY) facility Public Private Partnership (PPP) projects are feasible measures to realize sustainable urbanization.
Hui Zhao, Jingqi Zhang, Yuanyuan Ge
doaj +1 more source
Assessment of the Feasibility of PPP-B2b Service for Real-Time Coseismic Displacement Retrieval
Traditional coseismic displacement retrieval generally uses real-time kinematic (RTK) and precise point positioning (PPP) services. However, both RTK and real-time PPP need a network link to transmit the corrected data.
Hao Yang +5 more
doaj +1 more source
Asset-backed securitization (ABS) is currently used to refinance public-private partnership (PPP) projects in the infrastructure field. To stimulate the investors' enthusiasm, this study evaluated the investment environment of PPP projects asset-backed ...
Lijun Zhang, Junwen Feng, Bo Feng
doaj +1 more source
Optimization method for multi-constellation precise point positioning performance evaluation [PDF]
In order to reduce the number of parameters to be estimated and improve the positioning accuracy in the data processing of multi-constellation Precise Point Positioning(PPP),a performance evaluation method based on ambiguity integer solution for the ...
HE Wei,GUO Chengjun,TIAN Zhong
doaj +1 more source
Review and principles of PPP-RTK methods [PDF]
PPP-RTK is integer ambiguity resolution-enabled precise point positioning. In this contribution, we present the principles of PPP-RTK, together with a review of different mechanizations that have been proposed in the literature. By application of $$\mathcal {S}$$
Teunissen, Peter, Khodabandeh, Amir
openaire +2 more sources
Precise point positioning with ambiguity resolution (PPP-AR) is a powerful tool for geodetic and time-constrained applications that require high precision.
Omer Faruk Atiz +4 more
doaj +1 more source
Review of PPP–RTK: achievements, challenges, and opportunities
The PPP–RTK method, which combines the concepts of Precise of Point Positioning (PPP) and Real-Time Kinematic (RTK), is proposed to provide a centimeter-accuracy positioning service for an unlimited number of users.
Xingxing Li +6 more
doaj +1 more source
Risk Sharing of Urban Underground Comprehensive Pipe Gallery PPP Project Based on Grey Relational Analysis [PDF]
In order to establish a reasonable, effective and accurate risk sharing mechanism for PPP project of urban underground comprehensive pipe gallery, 25 risk factors are identified by the work structure decomposition method.
Shixia Duan, Jielin Diao
doaj +1 more source
Quantitative Assessment of the Likelihood of Disputes in PPP Projects Using Fault Tree Analysis
Disputes involved in public–private partnership (PPP) projects destroy the relationship between governments and private partners and generate huge losses.
Xiaoxiao Zheng +3 more
doaj +1 more source

