An Analysis of Priority-Based Decision Heuristics for Optimizing Elicitation Efficiency
2014[Context & motivation] Requirements are often elicited in hierarchies, with more fine-grained requirements being derived from abstract ones. This approach is typically used in business-process-driven requirements engineering BPRE where fine-grained system functions are derived from business activities contained in business processes. [Question/problem]
Norman Riegel, Jörg Dörr
openaire +2 more sources
The effect of combining simple priority heuristics in flow-dominant shops
International Journal of Production Research, 1996SUMMARY Previous scheduling research indicates that no single priority heuristic is effective on all the relevant performance criteria. However, few heuristics have shown to be effective on particular performance criteria. This study examines this issue further by applying various scheduling heuristics at different states of three flow-dominant shops ...
F. MAHMOODI, C. T. MOSIER, R. E GUERIN
openaire +1 more source
A heuristic for priority-based scheduling in a turbine manufacturing job-shop
International Journal of Industrial and Systems Engineering, 2008The increasing importance of make-to-order manufacturing, inventory reduction and resource optimisation have placed further emphasis on the growing role of scheduling in the current global business environment. Often there has been a problem of applying the mathematically rich concepts of scheduling theory to solve the real-time industrial problems ...
Sandeep Dulluri, V. Mahesh, C.S.P. Rao
openaire +1 more source
A Priority Heuristic Correlation Technique for Decision Tree Pruning
2019The main purpose of this study is to introduce a priority heuristic correlated information processing technique into decision support tree pruning problem by using behavior predicting and reasoning approach along with the probability correlation analysis framework. To verify its validity, evidence from some important tests is illustrated and discussed,
Yu Xiang, Li Ma
openaire +1 more source
Two Heuristic Approaches for Clustered Traveling Salesman Problem With d-Relaxed Priority Rule
Expert Systems With Applications, 2023Kasi Viswanath D, Alok Singh
exaly
A Priority-Based Level Heuristic Approach for Scheduling DAG Applications with Uncertainties
2022 IEEE 25th International Conference on Computer Supported Cooperative Work in Design (CSCWD), 2022Wei Zheng 0002 +3 more
openaire +2 more sources
Setting Priorities - A Heuristic Approach for Cloud Data Center Selection
Proceedings of the 5th International Conference on Cloud Computing and Services Science, 2015Ronny Hans +4 more
openaire +2 more sources
A New Job Priority Rule for the NEH-Based Heuristic to Minimize Makespan in Permutation Flowshops
Engineering Optimization, 2023Mark Goh, Son Duy Dao, Jiang-Hua Zhang
exaly
Efficient Priority Rules for Project Scheduling Under Dynamic Environments: A Heuristic Approach
Computers and Industrial Engineering, 2020Humyun Fuad Rahman +2 more
exaly
The priority-based traveling backpacker problem: Formulations and heuristics
Expert Systems with ApplicationsCalvin Rodrigues da Costa +1 more
openaire +2 more sources

