Results 281 to 290 of about 410,504 (298)
Some of the next articles are maybe not open access.
Proceedings of SPE Annual Technical Conference and Exhibition, 1998
Abstract This paper describes three alternatives to Monte-Carlo simulation: (a) the first-order second moment method, (b) the point estimate method, and (c) the first-order reliability method, for the assessment of uncertainty in reservoir engineering calculations.
openaire +1 more source
Abstract This paper describes three alternatives to Monte-Carlo simulation: (a) the first-order second moment method, (b) the point estimate method, and (c) the first-order reliability method, for the assessment of uncertainty in reservoir engineering calculations.
openaire +1 more source
Asia-Pacific Power and Energy Engineering Conference, 2012
In order to adapt the new situation that large-scale wind power is being integrated into power system more and more, the probabilistic production simulation method for mixed wind-hydro-thermal power system is researched and improved in this paper.
Hongyu Zhang +4 more
semanticscholar +1 more source
In order to adapt the new situation that large-scale wind power is being integrated into power system more and more, the probabilistic production simulation method for mixed wind-hydro-thermal power system is researched and improved in this paper.
Hongyu Zhang +4 more
semanticscholar +1 more source
Simulation of DSM resources as generating units in probabilistic production costing framework
IEEE Transactions on Power Systems, 1998To study the economics of DSM resources the avoided cost method is used which requires two production cost simulation runs; one with a base case set of loads and another with the load shape changed by the expected impact of DSM. This paper presents an efficient technique which allows a single simulation to study probabilistically the impact of DSM on ...
openaire +1 more source
IEEE Transactions on Power Systems, 1991
A description is given of how power system probabilistic production simulations can be performed by using the Legendre series to approximately represent the load and the equivalent load. This implies that knowledge about the minimum and maximum value of the load is used.
openaire +1 more source
A description is given of how power system probabilistic production simulations can be performed by using the Legendre series to approximately represent the load and the equivalent load. This implies that knowledge about the minimum and maximum value of the load is used.
openaire +1 more source
IEEE PES Innovative Smart Grid Technologies, 2012
In aspect of capacity, wind power generation and traditional power generation is inner connected. The capacity credit is a convenient and effective way to compare these two different types of power generation. Capacity credit of wind power (CCOWF) is presented in this paper, as well as a calculation method of CCOWF based on probabilistic production ...
null Junwei Liu +3 more
openaire +1 more source
In aspect of capacity, wind power generation and traditional power generation is inner connected. The capacity credit is a convenient and effective way to compare these two different types of power generation. Capacity credit of wind power (CCOWF) is presented in this paper, as well as a calculation method of CCOWF based on probabilistic production ...
null Junwei Liu +3 more
openaire +1 more source
2016 IEEE 11th Conference on Industrial Electronics and Applications (ICIEA), 2016
Fan Hong, Luan Ru, Jiang Yanbin
semanticscholar +1 more source
Fan Hong, Luan Ru, Jiang Yanbin
semanticscholar +1 more source
Correction to "An Investigation of Two Methods for the Probabilistic Energy Production Simulation"
IEEE Transactions on Power Apparatus and Systems, 1984Narayan S. Rau, Cristina Necsulescu
openaire +1 more source
IEEE Conference on Energy Conversion, 2014
Yuan Zhu, P. Jiang, Shaojing Yang
semanticscholar +1 more source
Yuan Zhu, P. Jiang, Shaojing Yang
semanticscholar +1 more source

