Results 291 to 300 of about 14,109,241 (348)
Some of the next articles are maybe not open access.
Scheduling of corrugated paper production
European Journal of Operational Research, 2009zbMATH Open Web Interface contents unavailable due to conflicting licenses.
Kazuki Matsumoto +2 more
openaire +2 more sources
Digital twin-based production scheduling system for heavy truck frame shop
Proceedings of the Institution of mechanical engineers. Part C, journal of mechanical engineering science, 2020Existing scheduling systems cannot respond quickly and efficiently to the appearance of uncertain variable interference factors in the scheduling process. The efficiency of the enterprise is hence seriously affected by these factors.
Yun-Rui Wang, Zhengli Wu
semanticscholar +1 more source
International Journal of Production Research, 2020
This paper investigates an integrated scheduling problem of production and outbound distribution with flexible vehicle departure time in a time-sensitive make-to-order supply chain.
Haitao Liu +2 more
semanticscholar +1 more source
This paper investigates an integrated scheduling problem of production and outbound distribution with flexible vehicle departure time in a time-sensitive make-to-order supply chain.
Haitao Liu +2 more
semanticscholar +1 more source
Production scheduling and genetic algorithms
1995This treatise deals with the applicability of genetic algorithms to the area of production scheduling. To begin with, an introduction to the principles of genetic algorithms is given. After having outlined a standard genetic algorithm, first approaches to the traveling salesman problem are explained.
openaire +2 more sources
ADAPTIVE CONTROL IN PRODUCTION SCHEDULING
IFAC Proceedings Volumes, 1980Abstract The paper reports on a new method for solving perturbation problems in the course of production scheduling of cutting operations in the field of machine tool manufacture. It can perform this task by supplementing a previously prepared heuristic scheduling method with an algorithm which optimizes cutting parameters.
M. Girnt, E. Szelke
openaire +1 more source
A recent survey of production scheduling
IEEE Transactions on Systems, Man, and Cybernetics, 1988Recent advances in the theory and practice of production scheduling cut across traditional disciplinary boundaries. Different research communities have addressed different aspects of the problem, bringing to bear a variety of research traditions, problem perspectives, and analytical techniques.
Frederick A. Rodammer +1 more
openaire +1 more source
Production scheduling of perishable products
International Journal of Production Research, 1976This paper extends the classical m product, single machine economic lot size problem to include the cost of returns due to spoilage. A revised cycle time is determined for the case where spoiled items are always returned and for the case where there is a chance the spoiled item will not be returned.
openaire +1 more source
Scheduling an Industrial Production Facility
2004Managing an industrial production facility requires carefully allocating limited resources, and gives rise to large, potentially complicated scheduling problems. In this paper we consider a specific instance of such a problem: planning efficient utilization of the facilities and technicians that maintain the United States nuclear stockpile.
Eyjolfur Ingi Asgeirsson +5 more
openaire +1 more source
Single-machine-based joint optimization of predictive maintenance planning and production scheduling
Robotics and Computer-Integrated Manufacturing, 2018Maintenance planning and production scheduling are two activities that are inter-dependent but most often performed independently in manufacturing. The maintenance planning affects both available production time and failure probability.
Qin-Ming Liu +4 more
semanticscholar +1 more source
A Manual Production Scheduling Algorithm
Journal of the Operational Research Society, 1974This paper describes a manual algorithm for determining optimal production schedules when there are linear costs associated with production and storage, demand is deterministic and there is no backlogging. The method is described for use in the one-product, one-line situation and extended for use in the multiproduct, one-line situation. Examples of the
openaire +2 more sources

