Critical Factors for Improving Reliability of Project Control Metrics throughout Project Life Cycle
, 2020A lack of consistent, reliable, and objective metrics and indicators for project controls poses major challenges for effectively measuring project progress and performance in the constructi...
Resulali E. Orgut +4 more
semanticscholar +1 more source
Tolerance limits for project control: An overview of different approaches
Computers & industrial engineering, 2019Monitoring the performance of projects in progress and controlling their expected outcome by taking corrective actions is a crucial task for any project manager.
M. Vanhoucke
semanticscholar +1 more source
Engineering Construction and Architectural Management
PurposeThe primary objective of this study is to analyze the correlation between the application of building information modeling (BIM), the construction project success (CPS) and project control. Additionally, this research aims to explore the potential
A. Waqar +2 more
semanticscholar +1 more source
PurposeThe primary objective of this study is to analyze the correlation between the application of building information modeling (BIM), the construction project success (CPS) and project control. Additionally, this research aims to explore the potential
A. Waqar +2 more
semanticscholar +1 more source
, 2019
This study examines how environmental concerns impact the connectivity amid formal, informal control and performance based on data gathered from different 156 construction companies.
S. Malik +16 more
semanticscholar +1 more source
This study examines how environmental concerns impact the connectivity amid formal, informal control and performance based on data gathered from different 156 construction companies.
S. Malik +16 more
semanticscholar +1 more source
MELDRETH DRIBBLE‐CONTROL PROJECT
Child: Care, Health and Development, 1979Summary Seven subnormal spastic children aged 15–16 years, who had the additional problem of profuse dribbling, were trained to associate an auditory cue, from a small box pinned to their clothes, with swallowing. A significant reduction in dribble rate was obtained for all children within the first week.
D L, Rapp, P M, Bowers
openaire +2 more sources
Journal of Project Management, 2022
Risk monitoring and control is often poorly implemented in construction projects because of a failure to monitor and manage identified risks. Construction companies experience significant losses due to project managers' lack of project risk monitoring ...
K. Obondi
semanticscholar +1 more source
Risk monitoring and control is often poorly implemented in construction projects because of a failure to monitor and manage identified risks. Construction companies experience significant losses due to project managers' lack of project risk monitoring ...
K. Obondi
semanticscholar +1 more source
International Journal of Project Management, 1986
Abstract The management of a project must be geared to the achievement of objectives. The fulfilment of objectives is based on the capability to identify and quantify the activities to be developed, to control their execution and to assign responsibilities for their execution. This means planning and control according to a logical procedure.
R Albonetti, M Gatti
openaire +1 more source
Abstract The management of a project must be geared to the achievement of objectives. The fulfilment of objectives is based on the capability to identify and quantify the activities to be developed, to control their execution and to assign responsibilities for their execution. This means planning and control according to a logical procedure.
R Albonetti, M Gatti
openaire +1 more source
2019
In this chapter we introduce statistical project control methods. We focus on the problems of determining whether project-generated data fall within or outside specification limits. The examples included in this chapter address construction quality problems, earned-value management, and project performance prediction.
Ivan Damnjanovic, Kenneth Reinschmidt
openaire +1 more source
In this chapter we introduce statistical project control methods. We focus on the problems of determining whether project-generated data fall within or outside specification limits. The examples included in this chapter address construction quality problems, earned-value management, and project performance prediction.
Ivan Damnjanovic, Kenneth Reinschmidt
openaire +1 more source
Project Monitoring and Project Control
2012This chapter covers all areas that need monitoring and control during the execution of the project; this is done by using specific tools, methods and procedures; every tool is explained, templates suggested and examples developed. For the most important aspects, i.e. monitoring and cost control, actual cases are proposed using ‘hand solving’ as well as
openaire +1 more source
2004
Agile methods like eXtreme Programming (XP, cf. [2]) are grass rooted. They derive from practicioneers and focus on their needs. Therefore, at the beginning, project controlling was not in the focus of agile methods. The paper shows how to integrate simple mechanisms for project controlling. These mechanisms address both developers and management needs.
Stefan Roock, Henning Wolf
openaire +1 more source
Agile methods like eXtreme Programming (XP, cf. [2]) are grass rooted. They derive from practicioneers and focus on their needs. Therefore, at the beginning, project controlling was not in the focus of agile methods. The paper shows how to integrate simple mechanisms for project controlling. These mechanisms address both developers and management needs.
Stefan Roock, Henning Wolf
openaire +1 more source