Results 251 to 260 of about 21,342,775 (312)
Some of the next articles are maybe not open access.
Related searches:
Related searches:
2021
The capability to elaborate a reliable estimate at completion for a project since the early stage of project execution is the prerequisite in order to provide an effective project control. The non-repetitive and uncertain nature of projects and the involvement of multiple stakeholders increase project complexity and raise the need to exploit all the ...
openaire +1 more source
The capability to elaborate a reliable estimate at completion for a project since the early stage of project execution is the prerequisite in order to provide an effective project control. The non-repetitive and uncertain nature of projects and the involvement of multiple stakeholders increase project complexity and raise the need to exploit all the ...
openaire +1 more source
2004
Agile methods like eXtreme Programming (XP, cf. [2]) are grass rooted. They derive from practicioneers and focus on their needs. Therefore, at the beginning, project controlling was not in the focus of agile methods. The paper shows how to integrate simple mechanisms for project controlling. These mechanisms address both developers and management needs.
Stefan Roock, Henning Wolf
openaire +1 more source
Agile methods like eXtreme Programming (XP, cf. [2]) are grass rooted. They derive from practicioneers and focus on their needs. Therefore, at the beginning, project controlling was not in the focus of agile methods. The paper shows how to integrate simple mechanisms for project controlling. These mechanisms address both developers and management needs.
Stefan Roock, Henning Wolf
openaire +1 more source
Software Engineering Journal, 1986
In recent years the software industry has seen the increasing imposition of structure and discipline on technical development activities in an attempt to improve the efficiency of software development and the reliability of the software produced. The clear emphasis in the modern approach to software engineering is to focus attention on the overall ...
openaire +1 more source
In recent years the software industry has seen the increasing imposition of structure and discipline on technical development activities in an attempt to improve the efficiency of software development and the reliability of the software produced. The clear emphasis in the modern approach to software engineering is to focus attention on the overall ...
openaire +1 more source
Project Monitoring and Project Control
2012This chapter covers all areas that need monitoring and control during the execution of the project; this is done by using specific tools, methods and procedures; every tool is explained, templates suggested and examples developed. For the most important aspects, i.e. monitoring and cost control, actual cases are proposed using ‘hand solving’ as well as
openaire +1 more source
Controlling action research projects
Information Technology & People, 2001Action research (AR), which emphasises collaboration between researchers and practitioners, is a qualitative research method that has much potential for the information systems (IS) field. AR studies of IS phenomena are now beginning to be published in the IS research literature. However, the rigour of many AR studies in IS can be improved. When AR has
David E. Avison +2 more
openaire +1 more source
2017
Abstract Our notion of project control is based on the five-by-five model and constitutes a comprehensive control model including control of results, time and work control, resource control, financial control, and contract management.
openaire +1 more source
Abstract Our notion of project control is based on the five-by-five model and constitutes a comprehensive control model including control of results, time and work control, resource control, financial control, and contract management.
openaire +1 more source
Control, PRO , and the Projection Principle
Language, 1986This paper presents a theory of control (predication), in terms of thematic relations, which makes no use of the element PRO in the syntax. Important consequences of the theory are that the θ-Criterion must be relativized to particular local domains, and the Projection Principle cannot be maintained.
Peter W. Culicover, Wendy Wilkins
openaire +1 more source
MELDRETH DRIBBLE‐CONTROL PROJECT
Child: Care, Health and Development, 1979Summary Seven subnormal spastic children aged 15–16 years, who had the additional problem of profuse dribbling, were trained to associate an auditory cue, from a small box pinned to their clothes, with swallowing. A significant reduction in dribble rate was obtained for all children within the first week.
D L, Rapp, P M, Bowers
openaire +2 more sources

