Results 291 to 300 of about 17,302,014 (354)
Some of the next articles are maybe not open access.
On the performance projectability of MapReduce
4th IEEE International Conference on Cloud Computing Technology and Science Proceedings, 2012A key challenge faced by users of public clouds today is how to request for the right amount of resources in the production datacenter that satisfies a target performance for a given cloud application. An obvious approach is to develop a performance model for a class of applications such as MapReduce.
Di Xie +2 more
openaire +1 more source
Information Systems Journal, 2020
Software process tailoring (SPT) is a team‐based and learning‐intensive activity that addresses the particular dynamic characteristics of a development project.
Jung-Chieh Lee +2 more
semanticscholar +1 more source
Software process tailoring (SPT) is a team‐based and learning‐intensive activity that addresses the particular dynamic characteristics of a development project.
Jung-Chieh Lee +2 more
semanticscholar +1 more source
, 2020
Although contractual governance and trust have been regarded as critical factors for explaining construction project performance, their interplay at different stages of project development ...
Ling Yan, Lihan Zhang
semanticscholar +1 more source
Although contractual governance and trust have been regarded as critical factors for explaining construction project performance, their interplay at different stages of project development ...
Ling Yan, Lihan Zhang
semanticscholar +1 more source
, 2020
Integrated Digital Delivery (IDD) was launched to transform the approach to construction through the implementation of digital technologies. Whilst technologies have the potential to improve project performance, there are limited studies on IDD in the ...
B. Hwang +2 more
semanticscholar +1 more source
Integrated Digital Delivery (IDD) was launched to transform the approach to construction through the implementation of digital technologies. Whilst technologies have the potential to improve project performance, there are limited studies on IDD in the ...
B. Hwang +2 more
semanticscholar +1 more source
Empirical Study of Project Managers Leadership Competence and Project Performance
EMJ - Engineering Management Journal, 2017Riaz Ahmed, Vittal Anantatmula
exaly +2 more sources
, 2020
This study aims to investigate the relationships between the different strengths of ties (strong ties and weak ties), types of trust and project performance in megaprojects.,A questionnaire survey was conducted with various experts and professionals ...
Guangdong Wu +3 more
semanticscholar +1 more source
This study aims to investigate the relationships between the different strengths of ties (strong ties and weak ties), types of trust and project performance in megaprojects.,A questionnaire survey was conducted with various experts and professionals ...
Guangdong Wu +3 more
semanticscholar +1 more source
The measurement of performance in IT projects
International Journal of Electronic Business, 2007Most literature in project management suggests that project success and failure should be measured by the project manager's ability to meet cost, quality and time objectives. However, the concept of project success and failure remains ambiguous and ill defined.
openaire +1 more source
Barriers to Project Performance
2013 46th Hawaii International Conference on System Sciences, 2013This paper contributes to our understanding of how the performance of IT projects might be improved. It identifies the need for including drivers of failure and underperformance in models of project performance and proposes such a model, focusing on organizational capabilities available to apply to projects.
openaire +1 more source
Towards an integrated measurement of IS project performance: The project performance scorecard
Information Systems Frontiers, 2008Determining the contribution of information system (IS) projects is a difficult endeavour. This research presents a framework for evaluating and measuring IS project performance that seek to address this problem while moving away from the reliance on the traditional assessment method (time, cost, specifications).
openaire +1 more source
How does strength of ties influence project performance in Chinese megaprojects?
, 2020This study aims to investigate how the strength of ties (i.e. strong ties and weak ties) in megaproject networks influences project performance in terms of types of conflicts.,A questionnaire survey was undertaken with professionals in Chinese ...
Guangdong Wu +3 more
semanticscholar +1 more source

