Results 201 to 210 of about 198,428 (256)
Shift Schedule With Fewer Short Daily Rest Periods and Sickness Absence Among Health Care Workers: A Cluster Randomized Clinical Trial. [PDF]
Djupedal ILR +11 more
europepmc +1 more source
Some of the next articles are maybe not open access.
Related searches:
Related searches:
The 12th IEEE International Conference on Fuzzy Systems, 2003. FUZZ '03., 2004
Resource-constrained Project Scheduling (RCPS) is one of the NP-hard classes because of the complexity of their combinatorial nature. Any exact algorithms are difficult to handle such a problem. In addition, uncertainty also often exists in many projects in the process of the estimate of activity durations.
null Hongqi Pan, null Chung-Hsing Yeh
openaire +1 more source
Resource-constrained Project Scheduling (RCPS) is one of the NP-hard classes because of the complexity of their combinatorial nature. Any exact algorithms are difficult to handle such a problem. In addition, uncertainty also often exists in many projects in the process of the estimate of activity durations.
null Hongqi Pan, null Chung-Hsing Yeh
openaire +1 more source
2010
This book lights out the different improvement of the recent history of fuzzy logic. The present chapter deals with the connections that exist between fuzzy logic and production scheduling.Production scheduling is a part of operational research which relies on combinatorial optimization solved by discrete methods.
Yalaoui, Naim +4 more
openaire +3 more sources
This book lights out the different improvement of the recent history of fuzzy logic. The present chapter deals with the connections that exist between fuzzy logic and production scheduling.Production scheduling is a part of operational research which relies on combinatorial optimization solved by discrete methods.
Yalaoui, Naim +4 more
openaire +3 more sources

