LESSONS IN SCHEDULING FROM A MULTI-STAKEHOLDER AIR-CARGO FACILITY CONSTRUCTION PROJECT [PDF]
Large infrastructure projects often involve multiple stakeholders whose activities influence project sequencing, creating coordination challenges that extend beyond traditional construction scheduling.
Amey Waikar +2 more
doaj +1 more source
Online Scheduling & Project Scheduling. [PDF]
This thesis presents new and improved scheduling algorithms for a number of scheduling problems. The first part of the thesis deals with two online-list scheduling problems, both with the objective to minimize the makespan. In these problems, the jobs arrive one by one and the decision maker has to irrevocably schedule the arriving job before the next ...
openaire +3 more sources
Cost Optimal Project Scheduling
Cost Optimal Project Scheduling This paper presents the cost optimal project scheduling. The optimization was performed by the nonlinear programming approach, NLP. The nonlinear total project cost objective function is subjected to the rigorous system of the activity precedence relationship constraints, the activity duration ...
Klanšek, Uroš, Pšunder, Mirko
openaire +2 more sources
A multi-agent-based system for two-stage scheduling problem of offshore project
Aimed at enhancing the effectiveness and efficiency for offshore project scheduling, the mathematical model of two-stage scheduling is proposed according to the offshore project characteristics discussed in this article, which is used to solve the ...
Duanfeng Han +5 more
doaj +1 more source
In the process of project implementation, the deviation usually exists between the actual scheduling process and the predefined schedule. A typical situation is that the project cannot be executed according to the generated schedule due to the ...
Han Song, Guangmin Jia, Wuliang Peng
doaj +1 more source
Scheduling projects with labor constraints
zbMATH Open Web Interface contents unavailable due to conflicting licenses.
Cristina C. B. Cavalcante +4 more
openaire +2 more sources
Conventional project scheduling techniques often rely on manual trial-and-error methods, which can lead to inaccurate evaluations. This study presents a dynamic scheduling framework to dynamically adjust scheduling decisions based on real-time ...
Mohammad Esmaeil Gandomkar Armaki +2 more
doaj +1 more source
As an archipelagic country, Indonesia has high needs for its aviation development. About 270 million people are predicted to fly from and within Indonesia in 2034, which is three times larger than current market conditions.
Hidayat Melissa Putri +2 more
doaj +1 more source
Successful performance and completion of construction projects highly depend on an adequate time scheduling of the project activities. On implementation of time scheduling, the execution modes of activities are most often required to be set in a manner ...
Valenko Tadej, Klanšek Uroš
doaj +1 more source
Research on Construction Schedule Optimization of Assembly Building Based on NSGA-II [PDF]
Considering multiple possible scenarios in the process of project construction, the prefabricated project scheduling problem is studied in combination with the theory of multi-mode resource-constrained project scheduling problem.
Wang Ru, Lian Jing
doaj +1 more source