ANALYSIS ON SCHEDULING ACCELERATION FOR CONSTRUCTION PROJECT OF WEST SUMBA BAPPEDA BUILDING USING TIME-COST TRADE-OFF METHOD [PDF]

open access: yesRussian Journal of Agricultural and Socio-Economic Sciences, 2019
The construction project of West Sumba BAPPEDA (Development Planning Agency at Sub-National Level) Building, in the fiscal year of 2016, is located at Weekarou Street in Loli Sub-District of Waikabubak City of West Sumba District (East Nusa Tenggara) and
Come R.M.H., Kustamar
doaj   +1 more source

Financial Optimization of the Resource-Constrained Project Scheduling Problem with Milestones Payments

open access: yesApplied Sciences, 2021
This article presents the resource-constrained project scheduling problem with the discounted cash flow maximization criterion from the perspective of a contractor.
Marcin Klimek
doaj   +1 more source

Hybrid Particle Swarm and Differential Evolution Algorithm for Solving Multimode Resource-Constrained Project Scheduling Problem

open access: yesJournal of Control Science and Engineering, 2015
In order to find a feasible solution for the multimode resource-constrained project scheduling problem (MRCPSP), a hybrid of particle swarm optimization (PSO) and differential evolution (DE) algorithm is proposed in this paper.
Lieping Zhang, Yingxiong Luo, Yu Zhang
doaj   +1 more source

Algorithm training to search for the most appropriate fuzzy project scheduling program due to resource constraints [PDF]

open access: yesFanāvarī-i āmūzish, 2008
To schedule a project, you need to pay attention to the uncertainty about some of the project's parameters, such as the cost and time of the project. Fuzzy theory is used to consider this uncertainty.
H. Rajaee, F. Jazebi, A. Rashidi
doaj   +1 more source

Portfolio scheduling: an integrative approach of limited resources and project prioritization [PDF]

open access: yesJournal of Project Management, 2020
The main issue for portfolio managers is to find a feasible schedule that guarantees the availability of the resources required by the activities at the dates they are scheduled, which is the classical objective of the Resource-Constrained Multi-Project ...
Félix Villafáñez   +4 more
doaj   +1 more source

The resources occupancy in resource – constrained multi project scheduling problem [PDF]

open access: yesComputer Methods in Materials Science, 2011
This paper presents an adaptation of the Theory of Constraint (TOC ) to the multi – project scheduling problem. Variables customer expectations have forced changes in the company management.
Bożena Skołud, Bożena Marcińczyk
doaj   +1 more source

{MFPP(R). An R package for matrix-based flexible project planning [version 2; peer review: 2 approved, 1 approved with reservations, 1 not approved]

open access: yesF1000Research
Project planning and scheduling are essential parts of project management. While project planning and scheduling tools are already available to support traditional project management approaches, flexible project management approaches, such as agile ...
Aamir Saghir, Zsolt Tibor Kosztyán
doaj   +1 more source

Proactive and Reactive Multi-Project Scheduling in Uncertain Environment

open access: yesIEEE Access, 2019
In this paper, a proactive and reactive multi-project scheduling problem is addressed. This problem is related to the influences of uncertain factors, which leads to a deviation between actual scheduling and baseline scheduling, and a recovery strategy ...
Weixin Wang   +3 more
doaj   +1 more source

Dynamic Optimization of the Multi-Skilled Resource-Constrained Project Scheduling Problem with Uncertainty in Resource Availability

open access: yesMathematics, 2022
Multi-skilled resources have brought more flexibility to resource scheduling and have been a key factor in the research of resource-constrained project scheduling problems.
Min Wang, Guoshan Liu, Xinyu Lin
doaj   +1 more source

Weighted Multi-Skill Resource Constrained Project Scheduling: A Greedy and Parallel Scheduling Approach

open access: yesIEEE Access
This study addresses the Weighted Multi-Skill Resource Constrained Project Scheduling Problem (W-MSRCSPSP) with the aim of minimizing software project makespan.
Saeed Akbar   +5 more
doaj   +1 more source