Results 191 to 200 of about 4,242 (213)
Some of the next articles are maybe not open access.

Construcción del Puente sobre el Río Ciruelas-Miramar, Puntarenas

2017
On the Ciruelas River there is a bridge structure; however, the current state of the steel does not allow the passage of vehicles of any kind on it. According to the report PM-10-03, issued by the LanammeUCR Municipal Management Unit, "the deterioration status of the Negro Bridge is classified as extremely critical, due to the extent of the corrosion ...
Ávila Esquivel, Tania   +3 more
openaire   +1 more source

Análisis hidráulico del Acueducto del Gran Puntarenas

2018
Proyecto de graduación (licenciatura en ingeniería civil)
openaire   +1 more source

Análisis del comportamiento sísmico de la Catedral de Puntarenas

IABSE Congress Reports
<p>Este estudio se enfoca en el análisis del comportamiento sísmico de la Catedral de Puntarenas, declarada Patrimonio Histórico – Arquitectónico y construida décadas antes del primer Código Sísmico de Costa Rica (CSCR). Su seguridad da origen a una problemática debido a que está ubicada en una zona de alta sismicidad, pero dada su antigüedad ...
openaire   +1 more source

Lito comunidad: desarrollo marino costero, Playa Tambor Cóbano, Puntarenas

2019
Proyecto de graduación (licenciatura en arquitectura)
Estrada Penabad, Abigail   +1 more
openaire   +1 more source

Otitis en el cantón de Aguirre, Puntarenas, Costa Rica

2001
Objetivo: Este trabajo describe las otitis en el cantón de Aguirre desde el 8-3-95 al 9-10-97 así como el tratamiento utilizado. Materiales y métodos: Retrospectivo en 1995 y 1996 y prospectivo en 1997. La identificación de los casos fue en base a los registros de bacteriología y los expedientes del Hospital Max Terán Valis.
Gamboa, Ana Yéssika, Mora, Fernando
openaire   +1 more source

Home - About - Disclaimer - Privacy