Results 51 to 60 of about 3,069,753 (207)
In collaborative product development project plan phase, a reasonable allocation plan can shorten project duration. Static scheduling is a useful way to obtain the allocation result.
Yingzi Li, Shuo Zhang
doaj +1 more source
Resource-constrained project scheduling. [PDF]
: Resource-constrained project scheduling involves the scheduling of project activities subject to precedence and resource constraints in order to meet the objective(s) in the best possible way. The area covers a wide variety of problem types.
Herroelen, Willy, Demeulemeester, Erik
core
Resource Allocation in Streaming Environments [PDF]
The proliferation of the Internet and sensor networks has fueled the development of applications that process, analyze, and react to continuous data streams in a near-real-time manner.
K. Chandy +3 more
core +1 more source
Metastatic niche shaped by host factors influences disseminated cancer cell fate
Metastasis is shaped not only by cancer cells but also by the environments they encounter. This review explores how factors such as aging, diet, the microbiome, lifestyle, and environmental exposures remodel organ‐specific niches in the lung, liver, bone, and brain, influencing where metastatic cells survive, remain dormant, or grow, and ultimately ...
Gwennan Delyth Ward +2 more
wiley +1 more source
Resource Scheduling in ORCA for Next-Generation Mobile Networks: A Survey and Future Outlook
The immense growth of mobile and IoT traffic is pushing the surging data demand beyond the traditional mobile network architectures towards a new domain of architectures, i.e., converged optical and radio networks (ORCA).
Sandra Arnaout +6 more
doaj +1 more source
Models for robust resource allocation in project scheduling. [PDF]
The vast majority of resource-constrained project scheduling efforts assumes complete information about the scheduling problem to be solved and a static deterministic environment within which the pre-computed baseline schedule will be executed.
Herroelen, Willy, Leus, Roel
core
Inhibition of dipeptidyl peptidase 7 impairs lysophagy in LLOMe‐treated HepG2 cells
DPP7 inhibition delays ubiquitin‐dependent lysophagy by attenuating ubiquitin accumulation and the recruitment of SQSTM1 and LC3 to damaged lysosomes, resulting in delayed clearance of damaged lysosomes and impaired restoration of lysosomal homeostasis. Created using FigureLabs (Certificate ID: FL‐PUB‐20260922‐Z99XNX).
Na Yeon Park +8 more
wiley +1 more source
Exploration and Analysis of Resource Scheduling and Management Mode in Future Space TT&C Network
The running mode and existing issues of current resource scheduling system operation model of TT&C network were discussed firstly.Then the development trends of future resource scheduling and management models were summarized, included integration of
Hong ZHANG +4 more
doaj +2 more sources
Cloud computing has become a revolutionary model for providing computational resources and services via the internet. As the volume of tasks and the dynamic nature of cloud resources increase, several critical challenges emerge, including load balancing,
Olanrewaju L. Abraham +3 more
doaj +1 more source
A survey of variants and extensions of the resource-constrained project scheduling problem [PDF]
The resource-constrained project scheduling problem (RCPSP) consists of activities that must be scheduled subject to precedence and resource constraints such that the makespan is minimized.
Hartmann, Sönke, Briskorn, Dirk
core

