Results 241 to 250 of about 431,343 (275)
Some of the next articles are maybe not open access.
Fuel Resource Scheduling The Daily Scheduling Problem
IEEE Transactions on Power Apparatus and Systems, 1985The paper presents different network flow algorithms to handle the linear and nonlinear unit I/O characteristics of the daily fuel scheduling problem with hourly and daily fuel constraints. Results of a 17 unit/17 contract test system results are presented to illustrate the highlights of the proposed methodologies.
S. Vemuri +2 more
openaire +1 more source
Scheduling and Resource Allocation
2015Chap.8 SCHEDULING AND RESOURCE ALLOCATION - 8.1 Introduction: Energy-Aware Scheduling 8.2 Use of Linear Programming in Energy-Aware Scheduling 8.2.1 Finding the Optimal Solution Using a Linear Program 8.2.2 Benefits and Limitations of LP 8.3 Heuristics in Large Instances 8.3.1 Energy-Aware Greedy Algorithms 8.3.2 Vector Packing 8.3.3 Improving Fast ...
Agrawal, Pragati +9 more
openaire +3 more sources
Reconfigurable resource scheduling
Proceedings of the eighteenth annual ACM symposium on Parallelism in algorithms and architectures, 2006We consider a class of scheduling problems that we refer to as reconfigurable resource scheduling. This class of problems is motivated by emerging applications that involve dynamically allocating a large number of shared resources to a variety of services. We design efficient online algorithms for certain problems in this class.
C. Greg Plaxton +3 more
openaire +1 more source
Scheduling under Labour Resource Constraints
Constraints, 2000zbMATH Open Web Interface contents unavailable due to conflicting licenses.
Heipcke, Susanne +3 more
openaire +2 more sources
Resource Constrained Scheduling
1993The scheduling model we consider now is more complicated than the previous ones, because any task, besides processors, may require for its processing some additional scarce resources. Resources, depending on their nature, may be classified into types and categories.
Jacek Błazewicz +3 more
openaire +1 more source
International Journal of Project Management, 1984
The scheduling of a project on a construction site frequently starts with a consideration of the resources available. A formalized approach to scheduling on this basis, which has attracted the interest of contractors on both sides of the Atlantic, is described.
openaire +1 more source
The scheduling of a project on a construction site frequently starts with a consideration of the resources available. A formalized approach to scheduling on this basis, which has attracted the interest of contractors on both sides of the Atlantic, is described.
openaire +1 more source
2022
This thesis was scanned from the print manuscript for digital preservation and is copyright the author. Researchers can access this thesis by asking their local university, institution or public library to make a request on their behalf. Monash staff and postgraduate students can use the link in the References field.
openaire +1 more source
This thesis was scanned from the print manuscript for digital preservation and is copyright the author. Researchers can access this thesis by asking their local university, institution or public library to make a request on their behalf. Monash staff and postgraduate students can use the link in the References field.
openaire +1 more source
[1989] Proceedings. Real-Time Systems Symposium, 1991
zbMATH Open Web Interface contents unavailable due to conflicting licenses.
Gillies, Donald W., Liu, Jane W.-S.
openaire +1 more source
zbMATH Open Web Interface contents unavailable due to conflicting licenses.
Gillies, Donald W., Liu, Jane W.-S.
openaire +1 more source
PICMET '07 - 2007 Portland International Conference on Management of Engineering & Technology, 2007
Summary form only given. In today's global economy, service providers are under increasing pressure to maximize margins and streamline operational efficiency to remain competitive. In order to do this, providers are turning to new technologies, advanced collaboration with partners and creative service strategies to ensure a well-managed workforce. They
openaire +1 more source
Summary form only given. In today's global economy, service providers are under increasing pressure to maximize margins and streamline operational efficiency to remain competitive. In order to do this, providers are turning to new technologies, advanced collaboration with partners and creative service strategies to ensure a well-managed workforce. They
openaire +1 more source
Resource-Constrained Scheduling
2001As we have seen, maximizing the net present value of a project can be done in polynomial time, if precedence constraints are the only side constraints that have to be taken into account. Unfortunately, things become much more complex, if resource constraints come in as well. We consider here renewable resources.
openaire +1 more source

