Results 11 to 20 of about 4,009 (156)
There is limited systematic knowledge available about the dynamics of rework in highway projects, despite the fact that they frequently exceed budget and schedule by more than 10%.
Nuria Forcada +3 more
doaj +6 more sources
Factors causing rework and their impact on projects’ performance in Egypt
The Egyptian construction industry suffers from severe delays and cost overruns. Rework is a prime cause of this challenge. Therefore, the objective of this study to identify the root causes of rework for Egyptian construction projects and their impact ...
Assim Muwafaq Al-Janabi +2 more
doaj +1 more source
We present inventory models to schedule an imperfect manufacturing process where a proportion of the items are defective. The proportion is known; and the production is followed by a 100% inspection.
Muhammad Al-Salamah
doaj +1 more source
Solving a deterministic multi product single machine EPQ model withpartial backordering, scrapped products and rework [PDF]
In this paper, an economic production quantity (EPQ) inventory model with scrap and rework is developed. The inventory model is for multiple products and all products are manufactured in a single machine.
Mehrnaz Najafi +2 more
doaj +1 more source
Analysis of bulk service queuing system with rework, unreliable server, resuming service and two kinds of multiple vacation [PDF]
In this paper, we discuss a batch arrival bulk service queue with rework for the faculty item, possibility of breakdown, repair, and two kinds of multiple vacation with different threshold policy.
Karpagam S.
doaj +1 more source
The amount of carbon emission in the atmosphere continues to grow, and production, storage and transportation are major contributors that are repeatedly unnoticed when it comes to solving the problem.
S. Priyan, P. Mala, M. Palanivel
doaj +1 more source
Rework has been and continues to be a problem during the construction of transport mega-projects. This article examines the error culture of an alliance that forms part of a transport mega-project to determine its effectiveness in mitigating rework.
Peter E.D. Love +3 more
doaj +1 more source
Importance Performance Analysis of Factors Causing Reworks in the Construction Industry
Rework can bring negative effect to construction project. This research aims to identify the importance level of factors causing reworks in structural, finishing, and mechanical, electrical and plumbing (MEP) works by a way of importance performance ...
Andi Andi, Jani Rahardjo, Fendy Fendy
doaj +1 more source
Determining EOQ Regarding the Quality of Products, Destructive Inspection, Reworking and a Review of Shortage and Deteriorating Items [PDF]
Among the most important unrealistic assumptions of EOQ model is the perfect quality of items received in stock. Trying to overcome this constraint and making the mentioned model get closer to real circumstances, this paper considers destructive ...
Hassan Torabi +2 more
doaj +1 more source

