Takt Planning in Apartment Building Renovation Projects

open access: yesBuildings, 2020
Takt production has been of great interest in construction during the last few years. In this research, a case study was carried out to demonstrate how the scheduling of an apartment building renovation project that utilizes takt production can be done ...
Arto Saari   +2 more
exaly   +4 more sources

Takt Production Monitoring and Control in Apartment Renovation Projects

open access: yesBuildings, 2021
Construction production is steered with the help of monitoring task progressions and comparing them to the schedule. Construction monitoring is often imprecise.
Arto Saari   +2 more
exaly   +3 more sources

Combining Decentralized Decision-Making and Takt Production in Construction Planning and Control to Increase Production Flow

open access: yesFrontiers in Built Environment, 2022
Takt production and decentralized decision-making have been recent areas of interest in (lean) construction management research. Both have the potential to improve flow and contribute to increased production performance. Despite the interest, the efforts
Olli Seppänen   +2 more
exaly   +3 more sources

Continuous Improvements at Operator Level [PDF]

open access: yesJournal of Engineering, Project, and Production Management, 2020
Few empirical studies have previously reported on the implementation of takt planning and utilizing Deming cycles (PDCA) to control construction workflows continuously.
Jon Lerche   +3 more
doaj   +1 more source

Indicators for Takt Production Performance Assessment—A Conceptual Study

open access: yesBuildings, 2023
This conceptual study aims to produce rough analysis methods and visualizations for production data (formatted in time, location, and work) that can be collected from construction sites that utilize takt production.
Kimmo Keskiniva   +2 more
doaj   +1 more source

Die Material Selection Criteria for Aluminum Hot Stamping

open access: yesJournal of Manufacturing and Materials Processing, 2021
The aim of this work is to develop a die material selection criterion for aluminum hot stamping applications. The criterion has been based on the back-to-back comparison of a set of reciprocating friction and wear tests.
Maider Muro   +2 more
doaj   +1 more source

Pedagogisk takt i fritidspedagogisk undervisning. En välregisserad dans mellan lärare och elever

open access: yesNordisk tidsskrift for pedagogikk og kritikk, 2022
Studien syftar till att skapa kunskap om relationella aspekter i lärares beskrivningar av fritidspedagogisk undervisning. Med stöd av begreppet pedagogisk takt synliggörs de mellanmänskliga aspekter som framträder i beskrivningarna av det pedagogiska ...
Helena Ackesjö, Marianne Dahl
doaj   +1 more source

Productivity improvement using different lean approaches in small and medium enterprises (SMEs) [PDF]

open access: yesManagement Science Letters, 2023
Small and Medium Enterprises (SMEs) play a crucial role in the Indian economy. To remain competitive in the global market, application of Lean Manufacturing Techniques (LMT) helps SMEs to improve their processes in alignment with customer needs.
Amrit Kumar Das, Manik Chandra Das
doaj   +1 more source

MAPEAMENTO DO FLUXO DE VALOR PARA CARACTERIZAÇÃO DO TAKT TIME COMO INDICADOR DE PERFORMANCE APLICADO AO SETOR CAFEEIRO

open access: yesRevista UniVap, 2023
Tendo como premissa a importância da otimização da cadeia de valor e introdução do pensamento enxuto nas empresas, este trabalho foca em responder a seguinte questão de pesquisa: seria possível identificar possíveis pontos de melhorias até mesmo numa ...
Erik Leonel Leone Luciano   +4 more
doaj   +1 more source

Validation of production system throughput potential and simulation experiment design

open access: yesInternational Journal of Production Management and Engineering, 2021
The throughput potential of a production system must be designed and validated before implementation.  Design includes creating product flow by setting the takt time consistent with meeting customer demand per time period and the average cycle time at ...
C. Standridge, M. Wynne
doaj   +1 more source