Results 141 to 150 of about 634 (165)
Some of the next articles are maybe not open access.

Cover-Time Planning/Takt Planning: A Technique for Materials Requirement and Production Planning

International Journal of Production Economics, 2017
Abstract Cover-Time Planning, or Takt Planning, is presented. It is a system for calculating material requirements and start of purchases and production. Requested production rates of sales items, or alternative prefabricated modules in stock, are “broken down”, exploded, to create the need for components, for all underlying items (articles) in the ...
Anders Segerstedt
exaly   +2 more sources

Experimental Assessment of the Productivity Improvement When Using U-Shaped Production Cells With Variable Takt Time [PDF]

open access: yesInternational Journal of Lean Six Sigma, 2015
Purpose – The aim of this research is to discuss the benefits of U-shaped layout for production cell operating in variable takt time. Different experiments were conducted using benchmarks to highlight the performance gap between a linear cell and a U-Cell.
Fouzia Ounnar, Patrick Pujo
exaly   +2 more sources

Implementation of Takt Time in the Development of a New Value Stream Mapping in the Production of Coffee Powder

2021
This work consists of the analysis of the coffee powder production system using the Value Flow Mapping (MFV) tool in a small factory, located in the interior of Vale do Paraiba, in the state of Sao Paulo, which is undergoing a moment of transition. The practice of the MFV tool was identified in the Toyota Production System, in which the production of ...
Érik Leonel Luciano   +4 more
openaire   +1 more source

Production, takt and lead time variation: Production planning and tardiness probabilities in small-lot production

2014 International Conference on Collaboration Technologies and Systems (CTS), 2014
This paper describes the production planning and control processes of two companies, which interact closely in the maritime supply chain. Our claim is that current theoretical models of the near-static tardiness that may be observed are insufficient. We offer an alternative, probability-based approach.
openaire   +2 more sources

Optimization of Production Takt for Automatic Press Line Based on Synchronous Motion of Press and Robot

Applied Mechanics and Materials, 2013
Motion synchronization is a new pattern in robot and press collaboration. In this paper, a synchronous motion algorithm of robot and press to improve production takt of automatic press line is proposed. First of all, we investigate the influence of different velocity and acceleration on identical trajectory of Fanuc handing robot with 6-degree of ...
Dong Ri Shan, Yan Yan Zhang, Xiu Hua Men
openaire   +1 more source

Effiziente Montagesysteme ohne Band und Takt*/Efficient assembly systems with dissolved line and takt - Are modular production structures a competitive alternative to the classical assembly line?

wt Werkstattstechnik online, 2017
Zunehmende Variantenvielfalt und schwankende Stückzahlen führen zu hohen Effizienzverlusten in abgetakteten starr verketteten Linien. Eine flexible Alternative sind modulare Produktionsstrukturen aus frei anfahrbaren Prozessmodulen. Der Fachartikel ergründet, wie leistungsfähig diese Strukturen für die personalisierte Serienproduktion im volatilen ...
P. Foith-Förster   +2 more
openaire   +1 more source

A PROGRAM-BASED TAKT-BASED THROUGHPUT CAPABILITY ANALYSIS (TBTCA) MODEL FOR DEMAND-ORIENTED PRODUCTION EVALUATION

Journal of Dynamics and Control
Aligning production capacity with customer demand is a critical challenge in manufacturing systems. Traditional evaluation approaches often lack the ability to dynamically assess multiple production scenarios and quantify demand gaps. This study presents a program-based TAKT-Based Throughput Capability Analysis (TBTCA) model, which integrates TAKT time
Ashwini V., Paul Vizhian S.
openaire   +1 more source

Le lean-manufacturing (système de production à haute performance) dans les industries travaillant en juste-à-temps avec flux régulés par takt-time (rythme de la consommation du client)

La Revue des Sciences de Gestion, Direction et Gestion, 2007
Le NIST (National Institute of Standards and Technology) donne la définition suivante du lean-manufacturing : « A systematic approach to identify and eliminating waste though continuous improvement, flowing the product at the pull of the customer in pursuit of perfection ».
openaire   +1 more source

How Takt Production Contributes to Construction Production Flow: A Theoretical Model

Construction Management and Economics, 2021
Max Grönvall   +2 more
exaly  

Home - About - Disclaimer - Privacy